BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Renovation of a multi-residential development in Okeechobee, Florida. Completed plans call for the renovation of a multi-residential development.

The Seminole Tribe of Florida Housing Department (STOFHD) is soliciting quotes from qualified vendors for full-service construction services on the Brighton Reservation. Housing Standardized Request for Repairs/Construction Bathroom: All wood cabinets are required at all times, when like for like is stated if current cabinet is particle board, include in the bid the price to replace with all wood Dur-rock on walls in the shower or tub area All joints, corners and around windows must be sealed with red guard Extend the Dur-rock 2' on all sides beyond the shower or tub Shower floor mortar bed, no foam or any other products should be used Minimum 2-4% pre-slope Liner should be water tested for 24 hours Minimum 6 inches All floor tile should be slip/skid resistant Shower floor tile should be a maximum of 2x2 mesh Provide backing for all walls inside tub/shower area between 32" and 38" Faucets should be Kohler or Delta From shower diverter to shower head piping must be copper tubing and copper fittings Secure the diverter and pipe fittings securely When tiling the walls extend 2 feet passed the shower or tub ADA bathroom the entire bathroom must be tile a minimum of 4 feet All toilets must be Kohler highline All exhaust must be vented through the roof or soffit The exhaust fan and light for the bathroom must be on the same switch All paint must be high gloss Kitchen: All wood cabinets are required at all times, when like for like is stated if current cabinet is particle board, include in the bid the price to replace with all wood. All sinks should be deep double drop in sinks Faucets should be Delta with a pull out spray hose Moisture resistant (purple) drywall Cabinet screws should be a minimum of 2 1/2 inches Efforts should be made to find a stud If drywall is removed from floor to ceiling, blocking must be provided for upper and lower cabinets Mechanical/HVAC: All AC units must be installed on a metal stand with a secondary pan and connect float switch A primary float switch must be installed and connected When replacing duct work all joints and seams must be taped and mastic All new HVAC units must be a minimum of 16 seer All flexible ducts must be a minimum of R8 R-value All disconnects should be the pull type non-fuse Rheem, Goodman, Night and Day units preferred Caulk around all AC vents Keyed lockout caps must be on all units Water Heaters: GE brand, replaced like for like gallon size Drain pan required TRV piped to the outside All water heaters should have a separate shut off switch New code required Energy conservation code chapter 4 Heat traps are mandatory Deadline for Questions: 02/21/2022 @ 3:00 pm EST All requests for clarification and/or any additional questions regarding this ITQ must be submitted via email to: DarrylKinchen@semtribe.com Seminole Tribe of Florida Housing Department ATTN: Darryl Kinchen 650 E. Harney Pond Rd Okeechobee, FL, 34974 The STOFHD reserves the right to reject any or all quotes, to waive formalities or informalities, and to award contract, either in whole or in part. The right is also reserved to select minority vendors and/or vendors with tribal member ownership. The Scope-of-Work ("SOW") contained in the Attachments describes the services expected for a Contractor to provide the STOFHD. Respondent must ensure that all such services contained in the SOW are provided for in every particular and shall meet or exceed the level of quality, availability, features, functionality, frequency, accuracy, and performance. The silence of specifications or requirements as to any detail contained in this document or any of the attachments or exhibits, or the apparent omission from any specifications or requirements, or a detailed description concerning any point, shall be regarded as meaning that only the best commercial practices shall prevail and that only material and workmanship of the finest quality are to be used. All interpretations of the Scope of Work shall be made on the basis of this statement. All requests for clarification and/or any additional questions regarding this ITQ must be submitted via email to: DarrylKinchen@semtribe.com.

Post-Bid

Multi-Residential

$60,000.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
141
Active Projects
74
Bidding Soon
1,005
All Active Projects
443
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 23, 2022

March 25, 2022

img_map_placeholder

300 Gopher Gully NE, Okeechobee, FL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.