Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Burlington, Ontario. Contact the soliciting agency for additional information.
The successful proponent will work with a team of City staff to deliver the studies, the City's team will be led by the Corporate Energy and Emissions Coordinator and will also include Project Management, Asset Management, Operational and Financial staff as well as external maintenance contractors. The studies for each of the four buildings included must articulate one "GHG reduction pathway" selected through a comparison of four greenhouse gas (GHG) reduction pathway scenarios. The following scenarios will be used in these studies: A 10-year plan that achieves a minimum 50% reduction in on-site GHG emissions vs. current performance and a 20-year plan that achieves a minimum 80% reduction in on-site GHG emissions vs. current performance A "short-term deep retrofit" scenario: This includes the same GHG reduction measures as the scenario 1. except that all measures are implemented in the first two to five years (possibly through inclusion of additional funding and financing options such as Infrastructure Canada's Green and Inclusive Community Buildings program). A "maximum site potential" scenario: This targets the greatest reduction potential possible, independent of capital considerations An "optimized outcome" scenario: This considers cost-per-tCO2e targets, GHG reduction targets, and other qualitative and quantitative impacts optimized according to project proponent objectives The following are items to be included as part of the final scenario that is selected: Alignment with funding opportunities The final study document shall identify prospective national and regional incentives and funding programs for Capital Projects, including the Federation of Canadian Municipalities CBR GHG reduction pathway capital projects. Funding opportunities can inform capital planning for the GHG reduction pathway, and consideration should be given to any requirements or prerequisites for these incentives and programs that could be integrated into the scope of work for this study. Future work preparation The measures identified in the selected GHG reduction pathway scenario will be taken to the design brief stage of the design process. When the deep energy retrofits are scheduled to take place, the final deep energy retrofit studies and design briefs will be used for the basis of the future schematic design. Broader sustainability and resilience analysis It is understood that GHG reduction pathway scenarios will have other qualitative benefits (e.g. occupant comfort) or non-energy/GHG benefits (e.g. water savings) that may be important to the project proponent and other key stakeholders. Study teams are encouraged to integrate these considerations into a broader decision-making process. The project proponent may also consider aligning the study outcomes with climate resilience planning (e.g. by applying a Climate Lens). This could include examining future weather and climate impacts (e.g. rising temperatures or flood risks) and assigning qualitative or quantitative value to measures that improve resilience. Facilities Included The facilities chosen to undergo deep energy retrofit all have major building and site elements up for renewal in the next 3-5 years such as parking lots, windows and other building envelope elements and heating, ventilation and air conditioning (HVAC) systems. Brant Hills Community Centre Appleby Ice Centre Fire Station 2 Fire Station 7 Question Deadline: Wed Feb 23, 2022 2:00:00 PM (EST) The method of contractor selection has not been determined at this time.
Conceptual
Clubhouse / Community Centers
Public - City
Service, Maintenance and Supply
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 18, 2022
Multiple Locations, Burlington, ON
Related To This Project
Burlington, ON
Bid Date: Feb 08 2022
Burlington, ON
Bid Date: Sep 22 2020
Burlington, ON
Bid Date: Mar 03 2022
Burlington, ON
Bid Date: Mar 14 2019
Burlington, ON
Bid Date: Mar 01 2022
Burlington, ON
Bid Date: Feb 26 2022
Burlington, ON
--
Burlington, ON
Bid Date: Feb 25 2022
Burlington, ON
--
Burlington, ON
Bid Date: Feb 10 2022
Burlington, ON
Bid Date: Jan 28 2022
Burlington, ON
Bid Date: Feb 17 2022
Burlington, ON
--
Burlington, ON
--
Burlington, ON
Bid Date: Jan 25 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.