BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Aurora, Colorado. Conceptual plans call for site work for a water / sewer project.

As of 2/21/22 Addendum 1 is available. Contact owner for info. Phase 1- Investigations and the Phase II- Transmissivity and Source Water Investigations are complete and indicated the feasibility of storing between 7,800 and 8,600 acre-ft of water in the alluvial aquifer within the ACRE property and supported further testing of ASR through piloting at a larger scale. A Box Elder ASR Pilot Facility 60% Design has been completed and is attached (Attachment 5) to the RFP. Source water for the pilot facility should be from new groundwater wells in each of the Upper Arapahoe and Lower Arapahoe aquifers. Recharge should be through a surface infiltration recharge basin. Aurora Water's goal is to demonstrate dominion and control of stored water. In this case, "dominion and control" is the ability to track, account for, and recover water recharged into the alluvial aquifer. The pilot facility is to demonstrate storing and subsequently recovering approximately 200 acre-ft of water over an approximate 15-18-month pilot period. The actual amount water recharged will be based on the yield from the Denver Basin wells and infiltration capacity of the basin. Recharged water should be recovered using a single vertical alluvial well. The quality of the Box Elder alluvial groundwater and source water (Upper and Lower Arapahoe aquifer groundwater) are believed contrasting enough to support the use of intrinsic (natural) tracers for spatial monitoring of recharged source water during pilot testing. It is currently assumed that the Substitute Water Supply Plan (SWSP) associated with the pilot operations will be prepared and covered under a separate contract. question Acceptance Deadline 03/03/2022 04:00 PM EST Questions are submitted online No The method of contractor selection has not been determined at this time

Conceptual

Water / Sewer

$600,000.00

Public - City

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
93
Active Projects
38
Bidding Soon
993
All Active Projects
415
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.