BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and new construction of an educational facility in Turlock, California. Completed plans call for the construction of a educational facility; and for site work for a educational facility.

The State of California, acting through the Board of Trustees of The California State University, hereinafter called Trustees, on behalf of California State University, Stanislaus, hereinafter called University, is requesting Statements of Qualifications (SOQ) from interested and qualified Design-Builders (Respondents) to provide design, preconstruction and design-build construction services for the project referenced above (Project). The delivery method for this Project is a modified form of the Trustees' Design-Build process, called Collaborative Design-Build. This is a two-phased project delivery process: Phase 1-Design and Preconstruction Services to define the Project, hereinafter referred to as Phase 1, and Phase 2-Design-Build Construction Services to complete the design and construct the Project, hereinafter referred to as Phase 2. There will be separate agreements for each phase. This modified process selects the Design-Builder on qualifications and proposed fees (a design competition is not utilized). During Phase 1 the University will issue a design and preconstruction services agreement, under which the Design-Builder will: complete the programming; develop the schematic design; commit to a guaranteed maximum price (GMP) and schedule; start Design Development; confirm other criteria are appropriate; and obtain CSU Board of Trustees (BOT) approval. Upon receipt of both the BOT approval of the schematic design and the University's authorization to proceed, Design-Builder shall: continue with the design development; publish a set of the Design-Build Construction Documents; and establish and submit a GMP to the Trustees. During Phase 2 the University will issue a GMP collaborative design-build agreement incorporating: the Design-Build Contract Documents; updated criteria; direct construction cost budget; GMP; contingency; remaining design fees; site management fees; payment and performance bond premiums; overhead and profit; and schedule as agreed upon in Phase 1. The Trustees are not obligated to proceed with Phase 2 with the selected Design-Builder. The Design-Builder is not obligated to proceed with Phase 2 if it so determines that the budget is not adequate, or for other business reasons. Phase 1 work products and electronic files of the Design-Builder are the property of the Trustees. In the event the Trustees and Design-Builder do not continue into Phase 2, these documents will be used by the University in any manner, including use as bridging documents for subsequent contracts. Payment Bond 100.00% Performance Bond 100.00% License Requirements - Class B and registered to bid Public Works with California Department of Industrial Relations Schedule Activities Schedule RFQ Advertised May 10, 2022 RFQ Conference (Non Mandatory) see section 10 May 24, 2022 Last day to submit application for prequalification on PlanetBids June 14, 2022 Last day to submit RFQ questions June 21, 2022 RFQ Addenda issued (if required) June 24, 2022 Statement of Qualifications due June 30, 2022 before 2:00 p.m. Proposer Shortlist published by e-mail July 8, 2022 RFP distributed to shortlist July 12, 2022 First Pre-Proposal Meeting July 26, 2022 Second Pre-Proposal Meeting August 9, 2022 Last day to submit RFP questions August 16, 2022 Proposals due date and time August 25, 2022 before 2:00 p.m. Proposing firms interviewed (Week of) September 6, 2022 Successful Proposer announced September 15, 2022 Phase1 (design and preconstruction services) agreement executed September 23, 2022 Schematic design BOT submittal due March 2023 Phase 2 (design build) agreement executed June 2023 Phase 2 start date (NTP) June 2023 Notice of Completion March 2026 Design-Build contract duration 919

Award

Educational

$3,984,000.00

Public - State/Provincial

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
135
Active Projects
70
Bidding Soon
1,338
All Active Projects
584
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 13, 2022

November 14, 2022

img_map_placeholder

1 University Cir, Turlock, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.