EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 27, 2022 at 8:00 PM

Updated October 1, 2024

Site work and paving for a road / highway in Kirkwood, Missouri. Completed plans call for site work for a road / highway; and for paving for a road / highway.

**As of May 27, 2022, project was awarded to Sweetens Concrete Services, awarded amount is $551,465.75** General information and instructions to bidders are contained in the terms and conditions. No Mailed, In-person Delivered, Faxed or E-mailed Bids will be accepted. Question Cutoff Date 2/22/2022 5:00 pm CT Upon the Citys issuance of a notice to proceed, the Contractor shall have no more than ninety (90) calendar days in which to complete the entire project, including all restoration. Liquidated damages in the amount of five hundred dollars ($500) per calendar day shall be paid by the contractor for each day that expires after the ninety (90) calendar day period allowed to complete the entire project. Allowances will be made for inclement weather. The City of Kirkwood Engineering Department would like to increase by 205 S.Y. for a new total quantity of 6,090 S.Y.

Award

Roads / Highways

$551,446.00

Public - City

Paving, Site Work

121

5

2

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 09 - Finishes

Division 09 - Finishes

Wall Finishes, Stone Facing
Division 10 - Specialties

Division 10 - Specialties

Storage Specialties, Postal Specialties, Mail Boxes, Other Specialties, Flags and Banners, Flags
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Subgrade Preparation, Excavation
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
85
Active Projects
50
Bidding Soon
792
All Active Projects
355
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2022

March 31, 2022

img_map_placeholder

Multiple Locations, Kirkwood, MO

Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

2022 Concrete Slab Replacement

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.