Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 10, 2022 at 7:00 PM
Updated January 29, 2024
This is a service / maintenance or supply contract in Northbrook, Illinois. Contact the soliciting agency for additional information.
The Village of Northbrook is requesting proposals for consultant professional construction observation services for the South Lane water main replacement and related infrastructure improvements. The Village's FY 2022-23 Budget (May 1, 2022 to April 30, 2023) has allocated funding for the construction of the South Lane Water main Replacement. A brief summary of the construction work to be implemented can be found below: This project involves the replacement of an existing 4" cast iron water main that was constructed in 1941 and is approximately 1,000 feet in length. The existing main dead ends at 1810 South Lane. In FY 2021/2022, the Village selected a consultant to prepare detailed engineering design plans for the replacement of the existing South Lane water main as well as the construction of the approximately 400 feet of new looping main to Driftwood Lane. This work is included in the project's final scope of work. Questions and requests for information must be submitted before noon local time on February 24, 2022 to Jack Bielak, Assistant Village Engineer, at jack.bielak@northbrook.il.us. The Village reserves the right to accept the proposal that is, in its judgment, the best and most favorable to the interests of Village and to the public based on the evaluation factors in this RFP; to reject the low price proposal; to accept any item of any proposal; to reject any and all proposals; and to waive irregularities and informalities in any proposal submitted or in the request for proposal process; provided, however, the waiver of any prior defect or informality shall not be considered a waiver of any future or similar defect or informality. Consultants should not rely upon, or anticipate, such waivers in submitting their proposal. The method of Contractor Selection has not been Determined at this time
Conceptual
Water / Sewer
$510,000.00
Public - City
Service, Maintenance and Supply
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 1, 2022
South Ln, Northbrook, IL
Related To This Project
Northbrook, IL
--
Northbrook, IL
Bid Date: Feb 01 2022
Northbrook, IL
Bid Date: Feb 01 2022
Northbrook, IL
Bid Date: Mar 18 2022
Northbrook, IL
Bid Date: Mar 18 2022
Northbrook, IL
Bid Date: Mar 18 2022
Northbrook, IL
Bid Date: Mar 18 2022
Northbrook, IL
Bid Date: Mar 18 2022
Northbrook, IL
--
Northbrook, IL
Bid Date: Feb 14 2022
Northbrook, IL
Bid Date: Jan 18 2022
Northbrook, IL
--
Northbrook, IL
Bid Date: Feb 03 2022
Northbrook, IL
--
Northbrook, IL
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
