EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 28, 2022 at 8:00 PM

Updated November 15, 2023

Site work and paving for a bridge / tunnel in Ramara, Ontario. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

The Bridge 02 is located on Poplar Crescent, between Pinetree Ct and Laguna Pkwy,in Lagoon City, Township of Ramara, Ontario. The general scope of work is as follows: Installation of environmental protection, cofferdam, and dewatering system; Excavate and remove deteriorated existing wood pier backwalls in stages per contract drawings shown; Repair piers, abutments and approaching shoring walls in stages; Installation of new pier backwalls for the piers simultaneously with backfill placement; Removal of environmental protection, cofferdam, and dewatering system; Restoration of all disturbed areas

Award

Bridges / Tunnels

$490,000.00

Public - City

Paving, Site Work

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Shop Drawings, Product Data, and Samples, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection
Division 08 - Openings

Division 08 - Openings

Glazing, Glass Glazing
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Excavation, Dewatering, Backfill, Embankments, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving
Division 33 - Utilities

Division 33 - Utilities

Utilities
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration

Find More Local Projects

Within 75 Miles of This Project
160
Active Projects
112
Bidding Soon
2,070
All Active Projects
808
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 3, 2022

May 3, 2022

img_map_placeholder

Poplar Crescent, Ramara, ON

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.