Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Grimes, Iowa. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
As of April 15, 2022, the project has been awarded. A timeline for construction has not been confirmed. The WRA Grimes Connector - Contract 3 project includes the construction of approximately 7,458 linear feet of sanitary sewer installed in open cut, 12-inch to 24-inch diameter, air release valves and manholes, 14,834 linear feet of 36-inch diameter force main installed in open cut, 55 feet of 12-inch diameter sanitary sewer installed in trenchless construction, 345 linear feet of 36-inch diameter force main installed in trenchless construction by several methods, manholes, excavation and backfill, removal and replacement of PCC trail, erosion control, surface restoration and miscellaneous associated work necessary to complete the project. The Contractor shall substantially complete the overall project no later than August 1, 2023. Substantial completion for the overall project shall be defined as the lift station, force main and sanitary sewer being fully operational. Should the Contractor fail to substantially complete the work within this timeframe, liquidated damages of One Thousand Dollars ($1,000.00) per calendar day will be assessed for work not substantially completed within the designated Contract term(s). The Contractor shall fully complete the project within forty-five (45) calendar days after substantial completion. Full completion for the overall project shall be defined as all improvements ready for final acceptance. Should the Contractor fail to fully complete the work within this timeframe, liquidated damages of Five Hundred Dollars ($500.00) per calendar day will be assessed for work not fully completed within the designated Contract term(s).
Award
Roads / Highways
$8,235,801.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 3, 2022
May 16, 2022
Multiple Locations, Grimes, IA
Related To This Project
Grimes, IA
Bid Date: Aug 20 2019
Grimes, IA
--
Grimes, IA
Bid Date: Dec 07 2021
Grimes, IA
Bid Date: Jan 19 2021
Grimes, IA
Bid Date: May 03 2022
Grimes, IA
Bid Date: May 03 2022
Grimes, IA
Bid Date: May 17 2022
Grimes, IA
Bid Date: Mar 26 2020
Grimes, IA
Bid Date: Apr 05 2022
Grimes, IA
Bid Date: Mar 24 2022
Grimes, IA
Bid Date: Mar 01 2022
Grimes, IA
Bid Date: Dec 20 2022
Grimes, IA
--
Grimes, IA
Bid Date: Oct 18 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.