Site work for a playground / park / athletic field in Natick, Massachusetts. Completed plans call for site work for a playground / park / athletic field.
90 Oak Street Remediation Project Off 90 Oak Street, Natick, MA 01760. Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. The Town reserves the right to reject any/all bids in the public interest. Award is subject to appropriation/vote of the Natick Select Board. Job No - 195-909.SV01 The Invitation for Bids ("IFB") may be obtained from the Procurement Office, Natick Public Works, 75 West Street, Natick, MA 01760, between 8:00 A.M. and 4:00 P.M. local time, Monday through Thursday, and between 8:00 A.M. and 12:00 P.M. (noon) local time, Friday, by emailing bleblanc@natickma.org, beginning on February 9, 2022. The Work for this project consists of the following scope items: Oak Street Remediation, further described as follows: The soil along the southern property boundary of the subject parcel which is developed as a recreational area including a playground, baseball field, walking paths and landscaped areas has been determined to contain impacted soils at concentrations above applicable limits under the Massachusetts Contingency Plan and the USEPA Toxic Substances Control Act (TSCA). To allow for continued use of the property as a recreational facility, the soil will be consolidated and capped, which involves placement of an engineered barrier consisting of an impervious liner and clean soils over the impacted soils in order to prevent human exposure to the soil and to eliminate the possibility of migration of the contaminated soil. In addition to the consolidation of impacted soils, the project will include adjustments to existing subsurface drainage infrastructure, installation of fencing, placement of rip rap on slopes and reseeding of the disturbed areas. The Successful Bidder agrees to pay as liquidated damages, the sum of four hundred ($400.00) per day for each calendar day ninety (90) calendar days (substantial completion) for which work in not substantially completed and eight hundred ($800.00) per day for each calendar day beyond one hundred thirty-five (135) calendar days.
Award
Playgrounds / Parks / Athletic Fields
$389,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 11, 2022
April 11, 2022
90 Oak St, Natick, MA
Related To This Project
Natick, MA
Bid Date: May 05 2023
Natick, MA
--
Natick, MA
Bid Date: Jul 27 2022
Natick, MA
--
Natick, MA
--
Natick, MA
Bid Date: Jan 05 2023
Natick, MA
Bid Date: Jun 09 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.