BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 30, 2026 at 8:00 PM

Updated May 20, 2026

Site work, paving, environmental remediation and outdoor lighting for a mixed-use development in Dorval, Quebec. Design plans call for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; for environmental remediation for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Urban redevelopment of a section of Bord-du-Lac-Lakeshore Road. The project will be divided into four specific sectors: sector 1 located between Dorval avenue and Mimosa avenue, sector 2 located between Mimosa avenue and Lilas avenue, sector 3 located between Lilas avenue and Tulip avenue and sector 4 located between Tulip avenue and Saint-Charles avenue. The project involves the construction of two lanes of traffic, on-street parking lots and a multi-level parking structure, construction of sidewalks at street level, installation of street furniture and development of a park on Dorval avenue, construction of cycle paths, street lighting, paving and landscaping. The project also includes work relating to the construction and repair of service networks and electrical installations, trees planting. Scope of work, budget and timelines of the project development are being finalized. Value of the project is not finalized and is an estimate. TIMELINE: Project implementation will be phased. Design of the first construction phase followed in the report under CRM ID name Chemin Bord-du-Lac Revitalization is underway. According to the owner's preliminary scheduling design of this project phase will be completed in fall/late 2026, construction start is anticipated in spring 2027. The awarded project manager is working on the scope establishment of further project phases. Start of the project construction is not anticipated before spring-summer 2027. Subsequent phases are planned for 2028-2030 period.

Design

Roads / Highways

$50,000,000.00

Public - City

Environmental Remediation, Outdoor Lighting, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 15, 2027

Project location map

Multiple Locations, Dorval, QC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.