Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 10, 2022 at 7:00 PM

Updated January 29, 2024

Site work and new construction of a mixed-use development in Starbuck, Washington. Conceptual plans call for the construction of a fire / police facility; for site work for a fire / police facility; pre-engineered storage facility; and pre-engineered storage facility.

Request for Qualifications for Engineering Services for a Metal Building. Columbia County Fire District #1 is seeking an engineer for the design of a metal building to store reserve fire apparatus. For Project Description, Scope of Services, Qualifications and Terms of Condition contact Krubenser2688@gmail.com or call Dick Rubenser 509-520-7381 for packet.

Conceptual

Warehouse / Distribution - Pre-Engineered Storage Building

$970,000.00

Public - County

New Construction, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
49
Active Projects
19
Bidding Soon
440
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2023

Project location map

To Be Determined, Starbuck, WA

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed