Published May 10, 2022 at 8:00 PM

Updated September 14, 2023

Site work, paving and outdoor lighting for a civil project in Wentzville, Missouri. Completed plans call for site work for a road / highway; for paving for a road / highway; and for outdoor lighting for a road / highway.

As of April 8th, 2022 this project is pending an award decision by the owner. If you are delivering your bid the day of the opening and intend to stay, you will be screened for temperature in the lobby on the first floor prior to admittance of the bid opening. If your bid is dropped off prior to the opening there will be someone in the lobby to receive it. The proposed work includes the furnishing of materials, tools, equipment and labor necessary to construct ROUTE A IMPROVEMENTS, in St. Charles County, Missouri. The construction shall include all work incidental to the furnishing of materials, tools, equipment and labor necessary to construct the proposed pavement widening and resurfacing, signal replacements, lighting, guardrail, and other appurtenances. Each Bid must be accompanied by a Cashier's Check or Certified Check, or a Bid Bond executed by the Bidder and an approved Surety Company and payable to the County, in an amount not less than Five Percent (5%) of the Sum Total of the Base Bid. All labor used in the construction of this public improvement shall be paid a wage no less than the prevailing hourly rate of wages of work of a similar character in this locality as established by the Department of Labor and Industrial Relations (State Wage Rate). The DBE goal for this letting is 0% of the total contract amount. All requests for clarifications on these bidding documents must be received in writing at least one week prior to the bid opening. All bidders must meet the MoDOT requirements as a Contractor at least seven (7) days prior to bid opening. A Performance Bond and Payment and Materials Bond are required. All requests for clarifications on these bidding documents must be received in writing at least one week prior to the bid opening. All bidders must meet the MoDOT requirements as a Contractor at least seven (7) days prior to bid opening. A Performance Bond and Payment and Materials Bond are required. The project will be awarded to the lowest responsive, responsible bidder. The County reserves the right to reject any and all Bids, to waive informalities therein to determine the lowest, responsive, responsible bidder, and to approve the bond. The County intends to issue the Notice to Proceed on or about April 25, 2022. MODOT - Route A Improvements

Award

Roads / Highways

$5,368,545.00

Public - County

Outdoor Lighting, Paving, Site Work

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of Electrical Systems
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Low-Voltage Switchgear, Facility Electrical Power Generating and Storing Equipment, Battery Equipment, Static Uninterruptible Power Supply, Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Bases, Ballasts, and Paving, Paving Specialties, Pavement Markings, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding
Division 33 - Utilities

Division 33 - Utilities

Electrical Utilities, Utility Substations
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Lifts

Find More Local Projects

Within 75 Miles of This Project
211
Active Projects
138
Bidding Soon
1,350
All Active Projects
688
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 14, 2022

April 25, 2022

img_map_placeholder

Route A, Wentzville, MO

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.