Site work and paving for a mixed-use development in Solon, Iowa. Completed plans call for site work for a road / highway; sidewalk / parking lot; water / sewer project; for paving for a road / highway; and sidewalk / parking lot.
The work will include but is not limited to the following improvements: EAST 5 th STREET RECONSTRUCTION Construct East 5 th Street Reconstruction project including the full reconstruction of approximately 2,500 ft of an existing rural section HMA overlay street to a 31 ft wide 8" PCC street with curb and gutter and storm sewer. Improvements include all labor, materials, and equipment necessary to construct 8" PCC pavement (9,384 SY) on a 6" modified subbase (2,183 CY); subdrain (2,625 LF); intakes (24 Ea.); 12" - 42" storm sewer (2,847 LF); PCC driveways (830 SY); 6" PCC trail and sidewalk (1,951 SY); 8" water main (747 LF); traffic control; earthwork, excavation, backfill, sitework; erosion control, seeding and miscellaneous associated work including cleanup. The street will need to be constructed in three phases to maintain two-way vehicle traffic and access at all times. Work on the improvements shall commence within ten days of the issuance of a written Notice to Proceed. The Notice to Proceed will be issued upon approval of the contract by the Council and be completed as stated below. Each proposal shall be made out on a blank form furnished by the municipality and must be accompanied by bid security, as follows: a certified or cashier's check, drawn on a solvent Iowa bank or a bank chartered under the laws of the United States or a certified share draft drawn on a credit union in Iowa or chartered under the laws of the United States, in an amount equal to five percent (5%) of the bid, or a bid bond executed by a corporation authorized to contract as a surety in the State of Iowa in a penal sum of five percent (5%) of the bid. The bid security should be made payable to the CITY OF SOLON, IOWA. The bid security must not contain any conditions either in the body or as an endorsement thereon. The bid security shall be forfeited to the City as liquidated damages in the event the successful bidder fails or refuses to enter into a contract within 10 days after the award of contract and post bond satisfactory to the City insuring the faithful fulfillment of the contract and the maintenance of said work, if required, pursuant to the provisions of this notice and other contract documents. Bidders shall use the bid bond form bound in the specifications. No bidder may withdraw a proposal within thirty (30) days after the date set for opening bids. The successful bidder will be required to furnish a bond in an amount equal to one hundred percent (100%) of the contract price, said bond to be issued by a responsible surety approved by the City Council and shall guarantee the faithful performance of the contract and the terms and conditions therein contained and shall guarantee the prompt payment for all materials and labor and protect and save harmless the City from claims and damages of any kind caused by the operations of the Contractor, and shall guarantee the work against faulty workmanship and materials for a period of four (4) years after its completion and acceptance by the City Council. All Contractor(s) and subcontractor(s) are required to obtain tax exemption certificates from the City of Solon, Iowa for this project. These tax exemption certificates are only for use on this specific project as covered under the Contract. The work under the contract shall commence within ten (10) days after date set forth in written Notice to Proceed. All work shall be substantially completed, subject to any extensions of time which may be granted by the City Council, by October 28, 2022. Substantial completion is defined as all work except the seeding and final clean-up. The final completion date shall be June 16, 2023, subject to any extensions of time which may be granted by the City Council. Interim liquidated damages in the amount of Five Hundred Dollars ($500.00) per calendar day will be assessed for each day that work on the total project except seeding and final clean-up shall remain uncompleted after October 28, 2022. Liquidated damages in the amount of Five Hundred Dollars ($500.00) per consecutive calendar day will be assessed for each day that work shall remain uncompleted after June 16, 2023, with due allowance for extensions of the contract period due to conditions beyond the control of the Contractor. Inclement weather shall not be considered for extension of the contract period. Separate liquidated damage assessments may be made for each of the two completion dates. Payment to the Contractor for said improvements will be made in cash derived from the proceeds of the issuance and sale of such bonds and/or from such cash funds of the City as may be legally used for said purposes. Any combination of the above methods of payment may be used at the discretion of the City Council. Payment to the Contractor will be on the basis of monthly estimates equivalent to ninety-five percent (95%) of the contract value of the work completed and payments made to material suppliers for materials ordered specifically for the project or delivered to the site during the preceding calendar month. Estimates will be prepared on the last day of each month by the Contractor, subject to the approval of the Engineer, who will certify to the City for payment each approved estimate on or before the tenth (10th) day of the following month. Such monthly payments shall in no way be construed as an act of acceptance for any part of the work partially or totally completed. Upon completion of the work and its acceptance by the Council, the Contractor will be paid an amount which, together with previous payments, will equal ninety five percent (95%) of the contract price of the contract. Final payment of the remaining five percent (5%) will be made not less than thirty one (31) days after completion and acceptance by resolution of the City Council of the completed contract, subject to the conditions and in accordance with the provisions of Chapter 573 of the Code of Iowa, as amended. No such partial or final payments will be due until the Contractor has certified to the City that the materials, labor and services involved in each estimate have been paid for in accordance with the requirements stated in the specifications. The request for payment may also include an allowance for the cost of such major materials and equipment which are suitably stored either at or near the site. Proof of purchase amount and verification of insurance for stored materials must be provided with any request for payment of stored materials. By virtue of statutory authority preference will be given to products and provisions grown and coal produced within the State of Iowa and to Iowa domestic labor. In accordance with Iowa statutes, a resident bidder shall be allowed a preference as against a nonresident bidder from a state or foreign country if that state or foreign country gives or requires any preference to bidders from that state or foreign country, including but not limited to any preference to bidders, the imposition of any type of labor force preference, or any other form of preferential treatment to bidders or laborers from that state or foreign country. The preference allowed shall be equal to the preference given or required by the state or foreign country in which the nonresident bidder is a resident. In the instance of a resident labor force preference, a nonresident bidder shall apply the same resident labor force preference to a public improvement in this state as would be required in the construction of a public improvement by the state or foreign country in which the nonresident bidder is a resident. In accordance with the requirements of the Iowa Department of Labor all bidders must submit a fully completed Bidder Status Form. The Bidder Status Form must be included with and is considered an essential attachment to the Proposal. Any Proposal that does not include a fully completed Bidder Status Form may result in the Proposal being determined non-responsive and rejected. If it is determined that adherence to these Iowa statutory requirements may cause denial of federal funds which would otherwise be available for a public improvement, or would otherwise be inconsistent with requirements of any federal law or regulation, the application of Iowa Code Chapters 73 and 73A shall be suspended to the extent necessary to prevent denial of the funds or to eliminate the inconsistency with federal requirements. The City of Solon reserves the right to reject any or all bids, to waive informalities, and to enter into such contract, or contracts, as it shall deem to be in the best interest of the City.
Award
Roads / Highways
$1,914,358.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 24, 2022
March 28, 2022
E 5th St, Solon, IA
Related To This Project
Solon, IA
Bid Date: Dec 14 2023
Solon, IA
Bid Date: Dec 21 2023
Solon, IA
Bid Date: Feb 08 2024
Solon, IA
Bid Date: Oct 29 2024
Solon, IA
Bid Date: Dec 17 2021
Solon, IA
Bid Date: Sep 19 2023
Solon, IA
Bid Date: Jun 29 2023
Solon, IA
Bid Date: Apr 27 2022
Solon, IA
Bid Date: Apr 27 2022
Solon, IA
Bid Date: Jan 28 2021
Solon, IA
Bid Date: Sep 22 2022
Solon, IA
Bid Date: Oct 31 2022
Des Moines, IA
Bid Date: Jul 21 2021
Riverside, IA
Bid Date: Feb 24 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.