BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in West Covina, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.

FY 2021-22 Residential Streets Rehabilitation Program (CDBG) The work consists of furnishing all materials, equipment, tools, labor, and incidentals as described in detail in the Bidding and Contract Documents, Plans and Specifications to construct the project. Major work components include construction of slurry seal, asphalt concrete cold mill and overlay, reconstruction of localized asphalt repairs, restoration of traffic loops, installation of traffic striping and all related work Every Bidder is required to attend the pre-bid meeting. Failure of a Bidder to attend will render that Bidder's Bid non-responsive. No allowances for cost adjustments will be made if a Bidder fails to adequately examine the Project site before submitting a Bid. Bidder's Guarantee: Each bid must be accompanied by cash or a certified check or a cashier's check or bidder's bond made payable to the City of West Covina for an amount equal to at least ten percent (10%) of the total contract price. In accordance with Public Contract Code Section 20170, the Bidder's Bond shall be issued by a surety company admitted to do business in the State of California. Further, in accordance with Public Contract Code Section 20172, such guarantee shall be forfeited should the bidder to whom the contract is awarded fail to enter into the contract within the specified time Contractor License: In accordance with provisions of Section 3300 of the California Public Contract Code, City of West Covina has determined that the contractor shall possess a class "A" valid California Contractor's License. Total construction duration is 40 working days. Engineer's Construction Cost Estimate: $2,400,000 The City reserves the right to reject any or all bids, to waive any irregularity, and to take all bids under advisement for a period of sixty (60) calendar days.

Bid Results

Roads / Highways

$1,867,200.00

Public - City

Paving, Site Work

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
210
Active Projects
107
Bidding Soon
2,255
All Active Projects
891
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 22, 2022

April 25, 2022

img_map_placeholder

Multiple Locations, West Covina, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.