BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 17, 2022 at 7:00 PM

Updated January 26, 2024

Renovation of a mixed-use development in Dothan, Alabama. Completed plans call for the renovation of a educational facility.

The Dothan City Board of Education (DCS) wishes to compare leased lit fiber and leased dark fiber. The current Wide Area Network Services are provided via leased lit fiber but enhanced bandwidth fiber services may be required to support rapidly growing bandwidth needs and to meet the State Education Technology Directors Association standard recognized in the FCC Second E-rate Modernization order as the benchmark standard for bandwidth for school districts. This Request for Proposal (RFP) requests services capable of data transmissions via fiber optic cable for Dothan City Schools. Services shall be provided to the locations detailed in the Addresses tab of the DCS_WAN_RFP_22-23 Spreadsheet. DCS is seeking six options for bids. Price quotes are requested for 12 months with four 12-month options, 36 months with two 12-month options and 60 months terms of service. Prices should be all inclusive. All-inclusive in this case means, including all special construction or non-recurring costs (NRC) (see description in later section) required by the vendor to commence service and all monthly recurring costs (MRC) should be included in the requisite columns of the pricing sheets. No increased pricing will be allowed during the term of the quoted special construction/NRC and MRC rate in each pricing cell of the spreadsheet. Respondents should submit a bid for all three term options of Lit Fiber, Leased Dark Fiber or both. a. The first option is a fully managed, leased lit fiber transport service from the hub to the specified eligible applicant sites. One-time special construction can be bid separately from the vendor's proposed monthly recurring cost for the fully managed leased lit service. b. The second option is for a leased dark fiber solution that includes special construction, the monthly lease fee, maintenance, and operations. One-time special construction costs should be bid separately from the monthly lease fee. Maintenance and operations fees can be included in the monthly lease fee. RFP Questions ...................................... February, 1 2022 - February 28, 2022 Vendors are to direct any and all questions regarding this Request for Proposal via email to: Mr. Jeremy Green Director of Technology Dothan City Schools Board of Education jergreen@dothan.k12.al.us 1665 Honeysuckle Rd. Suite 1, Dothan, AL 36305

Post-Bid

Educational

$50,000.00

Public - City

Renovation

6

5

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
105
Active Projects
44
Bidding Soon
717
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 7, 2022

April 6, 2022

Project location map

Multiple Locations, Dothan, AL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.