BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 4, 2022 at 7:00 PM

Updated March 22, 2025

Site work and paving for a road / highway in Walnut Creek, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The intent of the Contract Documents is to include all items necessary for the proper execution and completion of the Work. The Contract Documents are complementary, and what is required by any one shall be as binding as if required by all. Work not covered in the Contract Documents will not be required unless it is consistent and is reasonably inferable from those Contract Documents as being necessary to produce the intended results. Words and abbreviations which have well-known technical or trade meanings are used in the Contract Documents in accordance with those recognized meanings. The organization of the Project Manual into divisions, sections and articles, and the arrangement of Plans shall not control the Contractor in dividing the Work among Subcontractors or in establishing the extent of Work to be performed by any trade. The intent of the Plans and Specifications is to describe the details for the construction and completion of the Work that the Contractor undertakes to perform in accordance with the terms of the Contract. Where the Plans or Specifications describe portions of the Work in general terms but not in complete detail, it is understood that only the best general practice is to prevail and that only materials and workmanship of the first quality are to be used. Unless otherwise specifically stated, the Contractor shall furnish all tools, equipment and incidentals and perform all Work that is to be performed in the best workmanlike manner to assure that the completed Work will be in accordance with the Plans and Specifications. The Contractor is responsible for verifying all measurements and existing conditions related to his scope of Work before the start of any Work. If materials and/or equipment are to be furnished by the City, as designated in the Special Provisions or as agreed on, this shall not relieve the Contractor of the above requirements to furnish all other labor, materials and equipment to complete the Contract. By executing the Contract, the Contractor represents that he has visited the site, familiarized himself with the local conditions under which the Work is to be performed, and correlated his observations with the requirements of the Contract Documents. The Contractor shall, upon discovering any error or omission in the plans or Specifications, immediately call it to the attention of the Engineer.

Bid Results

Roads / Highways

$319,046.00

Public - City

Paving, Site Work

10

9

2

8

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
474
Active Projects
145
Bidding Soon
3,367
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.