Black Friday through Cyber Monday: Get 10% off Project Intelligence

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 11, 2022 at 7:00 PM

Updated November 14, 2023

Site work for a water / sewer project in Crescent, Oregon. Completed plans call for site work for a water / sewer project.

The District proposes to construct a new well to tie into the existing water infrastructure on the north side of Main Street. The well will be approximately 450 feet deep with a casing hole diameter of 16". Drilling a new well will consist of installing a new pump, motor column, check valves, and a well casing. The Project has an expected duration of 180 days. This Project is being funded in part through the Oregon Business Development Department - Infrastructure Finance Authority - Safe Drinking Water Revolving Loan Fund Program. Federal law requires that projects financed through the Safe Drinking Water Revolving Loan Fund only utilize iron and steel products produced in the United States. All iron and steel products or materials provided for the project by Contractor, a Subcontractor, or supplier shall be produced in the United States. Contractor will be required to demonstrate prior to award of the Contract that all iron and steel products intended for use in the project are produced in the United States. The Owner is an equal opportunity employer. Minority and women-owned businesses are encouraged to bid. Minority and women-owned businesses requesting Contract Documents should indicate they are a minority firm at the time they request Contract Documents so they may be listed on the Plan Holders List as a minority.

Bid Results

Water / Sewer

$537,405.00

Public - City

Site Work

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
31
Active Projects
8
Bidding Soon
188
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 8, 2022

April 7, 2022

Project location map

Multiple Locations, Crescent, OR

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed