Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and new construction of a water / sewer project in Granbury, Texas. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.
A new 0.82 MGD sequencing batch reactor (SBR) system, repurposing of existing structures, addition of a new grit removal system, construction of new dewatering building, and construction of a new operations building. A. This project will upgrade and expand the existing 0.487 mgd AMUD Wastewater Treatment Plant No. 2. The proposed design capacity is 0.82 mgd to provide additional wastewater treatment capacity for the Acton Municipal Utility District (Owner). B. Complete treatment will be provided by the following unit processes: 1. Mechanical and Manual Screen - The existing screening channel structure will have the existing mechanical screen and related appurtenances removed. A new 1/4 " mechanical screen with related appurtenances will be installed in the existing screening channel. The existing screening channel for the manual bar screen will be demolished entirely. A new channel for a manual bar screen will be constructed adjacent to the existing screening channel. A new 1" manual bar screen with related appurtenances will be installed in the proposed, adjacent screening channel. 2. Grit Removal System (Additive Alternate) - Construction of a vortex style grit removal system including installation of such equipment as grit removal pump and grit separator system. 3. Flow-Equalization - The existing oxidation ditch will be converted to an equalization flow basin. 4. In-Plant Lift Station - Existing Sludge Storage Tank No. 2 will be converted to an in-plant lift station. 5. Secondary Treatment - A new jet mix style batch sequencing batch reactor (SBR) system will be installed to replace the final clarifiers. The existing blowers will be demolished. New blowers will be installed in the SBR building. 6. Effluent Disinfection - The existing final clarifiers will be converted to parallel chlorine contact basins. A new chlorine gas system in the administration building will be installed. 7. Solids Storage - The existing chlorine contact basins will be converted to solids storage tanks (SST) with mixing and aeration equipment. 8. Solids Transfer - A new sludge transfer pump station will be constructed within the new dewatering building. The existing sludge transfer pump station will be demolished. 9. Solids Dewatering - The existing dewatering trailer will be removed. A new dewatering building with dewatering equipment will be constructed. 10. Controls - A new SCADA system will be installed for increased automation and remote monitoring capability. 11. Support Facilities - Construction of a new SBR Support Building adjacent to the SBR structures and construction of a new Administration Building (including a new motor control center, control room and laboratory space, restroom, office, etc.) will be included within the scope of this project.
Bid Results
Water / Sewer
$14,176,508.00
Public - County
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 9, 2022
May 9, 2022
To Be Determined, Granbury, TX
Related To This Project
Granbury, TX
Bid Date: Jun 16 2020
Granbury, TX
--
Granbury, TX
--
Granbury, TX
Bid Date: Jul 20 2022
Granbury, TX
--
Granbury, TX
Bid Date: Jul 21 2022
Granbury, TX
Bid Date: Aug 02 2022
Granbury, TX
--
Granbury, TX
Bid Date: Feb 08 2019
Granbury, TX
Bid Date: Apr 11 2022
Granbury, TX
--
Granbury, TX
--
Granbury, TX
--
Granbury, TX
--
Granbury, TX
Bid Date: Apr 11 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.