BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Ravenna, Ohio. Completed plans call for site work for a road / highway; and for paving for a road / highway.

For furnishing all labor, materials and equipment necessary to complete the project known as the 2022 - 441 RESURFACING IMPROVEMENTS, in Rootstown, Edinburg and Ravenna Townships, Portage County Tallmadge Road (CH18), from SR. 44 To Alliance Road in Rootstown and Edinburg Townships New Milford Road (CH 31), from Tallmadge To 5/44 bypass in Rootstown and Ravenna Townships Each bidder is required to furnish with its proposal, a Bid Guaranty and Contract Bond in accordance with Section 153.54 of the Ohio Revised Code. Bid security furnished in bond form, shall be issued by a surety company or corporation licensed in the State of Ohio to provide said surety. Each proposal must contain the full name of the party or parties submitting the proposal and all persons interested therein. Each bidder must submit evidence of its experiences on projects of similar size and complexity. The owner intends and requires that this project be completed no later than August 31, 2022. Only ODOT Prequalified contractors are eligible to submit bids for this project. Pre-qualification status must be in the force at the time of bid, at the time of award, and through the life of the construction contract. Additionally, contractor compliance with the equal employment opportunity requirements of Ohio Administrative Code Chapter 123, the Governor's Executive Order of 1972, and Governors Executive Order 84-9 shall be required. Bidders must comply with Federal (Davis Bacon) wage rates. All steel products must meet the requirements of ODOT C&MS 106.09 Engineers estimate of cost for this improvement is $2,351,467.75 The Portage County Commissioners reserve the right to waive irregularities and to reject any or all bids. The basis of award shall be lowest and best bid. Disadvantaged Business (DBE) Requirement. DBE participation goals (Subcontracts, materials, supplies) have been set on this project for those certified as DBEs in accordance with the TEA-21 (1998) and 49 CFR, Part 26, and qualified to bid with ODOT under Chapter 5525 of the Ohio Revised Code (O.R.C.)." At the beginning following the project identification the DBE goal designation is written, i.e. DBE Goal: 7%. Waiver Process for DBE Goals: See Attachment 1, ODOT LPA Template, Page 19, Good Faith Effort (GFEs).

Bid Results

Roads / Highways

$2,428,175.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
114
Active Projects
63
Bidding Soon
1,087
All Active Projects
426
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 9, 2022

May 9, 2022

img_map_placeholder

Multiple Locations, Ravenna, OH

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.