BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Milwaukee, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

CONSTRUCTION OF HANDICAP CONCRETE RAMPS PER ADA R E Q U I R E M E N T S , CONSTRUCTION STAKING OF RAMPS, DETECTABLE WARNING FIELD, 5" CONCRETE WALKS, CONCRETE WALK AND/OR DRIVEWAY, CONCRETE CURB AND GUTTER, 7" CONCRETE PAVEMENT VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIOUS CONCRETE REMOVALS, SEWER WORK, APPURTENANCE UNDERGROUND WORK, ETC.; Located at: ST216210112 - ADA RAMPS FOR 2022 HIGH IMPACT PAVING @ VARIOUS LOCATIONS (SOUTH SIDE PROJECTS) The scope of this contract is to remove and replace all of the pedes trian ramps within the limits of each of the City of Milwaukee "High Impact" asphalt paving projects. The "High Impact" asphalt paving projects are as follows: Official Notice No. 8-1-2022 East Juneau Avenue - North Prospect Avenue to North Van Buren Street East Kane Plane - North Summit Avenue to North Cambridge Avenue East Knapp Street - North Prospect Avenue to North Van Buren Street West Pierce Street - West Reynolds Place to South Layton Boulevard East Royall Place - North Prospect Avenue to North Oakland Avenue West Vliet Street - North 27th Street to North 47th Street Official Notice No. 9-1-2022 South 71st Street - West Burdick Avenue to West Lakefield Drive South Avalon Street - West Granada Street to South 15th Court (including South 15th Court) West Burdick Avenue - South 70th Street to South 71st Street East Carol Street - South Iowa Avenue to South Burst Avenue West Euclid Avenue - South 68th Street to South 70th Street West Granada St. - South 13th Street to South Avalon Street West Green Avenue - West Ramsey Avenue to South Melinda Street West Lakefield Drive - South 70th Street to West Oklahoma Avenue West Lincoln Avenue - South 1st Street to South Chase Avenue East Rhode Island Avenue - South Superior Street to East Fernwood Avenue West Tripoli Avenue - South Massachusetts Avenue to South 75th Street West Upham Court - South 18th Street to A point west of South 18th Street Time for Completion: All work on this contract shall be completed by August 31, 2022. The SBE requirement for this project is 25% of the contract base bid. The SBE Compliance Plan (Form A) must be submitted with the bid and is an element of bid responsiveness. Incomplete SBE Compliance Plans (Form A) or inaccurate SBE Compliance Plans will not be accepted and will render the bid unre sponsive.

Award

Roads / Highways

$822,788.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
206
Active Projects
99
Bidding Soon
2,395
All Active Projects
882
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 24, 2022

April 18, 2022

August 31, 2022

img_map_placeholder

Multiple Locations, Milwaukee, WI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.