BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a transportation facility in Phoenix, Arizona. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.

The City of Phoenix reserves the right to reject any or all Statements of Qualifications, to waive any informality or irregularity in any Statement of Qualifications received, and to be the sole judge of the merits of the respective Statements of Qualifications received. List the Arizona contractor licenses held by the firm and the key personnel who will be assigned to this project. Provide the contractor license number. Reference the appropriate licenses held, if needed. In order to be considered for this project, the contractor must hold the correct license as deemed appropriate by the Arizona Registrar of Contractors prior to submitting a Statement of Qualifications (SOQ) for this project in accordance with Arizona Revised Statute §32-1151. The Construction Manager at Risk will begin with the firm in an agency support role for preconstruction services. The CMAR will assume the risk of delivering the project through a Guaranteed Maximum Price (GMP) contract. The CMAR will be responsible for construction means and methods and will be required to solicit bids from prequalified subcontractors to perform the work using the City’s subcontractor selection process. For this project the CMAR is responsible for self-performing a minimum of 45% of the construction work as measured by total contract price for construction. The GMP must be submitted in MAG or CSI format or it will not be accepted. The project consists of reconstructing and reconfiguring connectors between Taxiway C and Runway 7R-25L to conform with current Federal Aviation Administration guidelines and eliminate non-standard intersections at Phoenix Deer Valley Airport. Connector C5, C6, C7, C8, and C10 will be demolished and reconstructed with a new configuration. Existing connectors between Taxiway C and Runway 7R-25L will be upgraded to address operational needs and hold bar locations between the runway and taxiway. Connectors C4, C7, and C10 will be perpendicular. Connectors C5, C6, and C9 will be acute angle connectors. Connector C9 will also have modified filets and be renamed C8.

Post-Bid

Transportation Terminals

$7,486,500.00

Public - City

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
42
Active Projects
22
Bidding Soon
713
All Active Projects
281
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 29, 2023

May 29, 2024

img_map_placeholder

702 W Deer Valley Rd, Phoenix, AZ

Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.