BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 8, 2022 at 8:00 PM

Updated October 23, 2025

Site work and paving for a road / highway in Coalville, Utah. Completed plans call for site work for a road / highway; and for paving for a road / highway.

County: Summit This Project Requires Using the Electronic Certified Payroll Program. See Attachment to Notice to Contractors. This Is a Working P+t (Price + Time) Project. Wage Rates: Apply Engineer's Estimate: Greater Than $1.5m but Less Than or Equal to $3m (Qualified Health Insurance Required) (Qualified Health Insurance Required) Project Location: I-80; MP 140.83-141.74, Median Concrete Barrier The principal items of work are as follows (for all items of work see attachment): Cast-In-Place Concrete Constant Slope Barrier - 42 Inch HMA - 1/2 inch Traffic Control The project is to be completed: to be determined by competitive bid Each bidder must submit an electronic bid bond from an approved surety company using UDOT's Electronic Bid System (EBS); or in lieu thereof, cash, certified check, or cashier's check for not less than 5% of the total amount of the bid, made payable to the Utah Department of Transportation, showing evidence of good faith and a guarantee that if awarded the contract, the bidder will execute the contract and furnish the contract bonds as required. Davis-Bacon wages apply to this project and are made a part of these contract documents as required in the provisions of the Federal-Aid Highway Act of 1968. This contract is subject to all appropriate Federal Laws, including Title VI of the Civil Rights Act of 1964 and the Fair Labor Standards Act of 1938, (52 Stat. 1060). SEE CERTIFIED PAYROLL SPECIAL REQUIREMENTS ATTACHMENT The right to reject any or all bids is reserved. Additional information may be secured at the office of the Utah Department of Transportation, (801) 965-4346 UTOT - I-80; MP 140.83-141.74, Median Concrete Barrier *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The OFCCP goals for minority representation in each trade are Summit 5.1%. The goal for female utilization (6.9 percent) applies to all contracts and subcontracts irrespective of their geographical location.

Award

Roads / Highways

$1,575,196.00

Public - State/Provincial

Paving, Site Work

17

7

8

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
139
Active Projects
78
Bidding Soon
1,038
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 17, 2022

May 30, 2022

Project location map

Interstate 80, Coalville, UT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.