EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 16, 2022 at 8:00 PM

Updated October 1, 2024

Site work for a playground / park / athletic field in Doylestown, Pennsylvania. Completed plans call for site work for a playground / park / athletic field.

Requests for clarification are due Friday, March 11, 2022 1:00:00 PM [(UTC-05:00) Eastern Time (US & Canada)]. 2022 Playground Renovation Project Groveland Elementary School Buckingham Elementary School nominal fee of 0.33% of the bid amount (up to $5,000.00) is assessed only to the successful bidder. Questions during the bidding process shall be submitted by RFI format through PennBid. If additional information is required concerning these bids, contact Thomas Hanna, P.E. at the Central Bucks School District Operations Center, 320 West Swamp Road, Doylestown, PA 18901 or by phone (267) 893-4013 Proposals shall conform to all other requirements as more fully set forth in the bidding documents. The Central Bucks School Board reserves the right to reject any or all bids, waive any informality in any bid, to eliminate or reduce quantities, and exercise its judgment as to the comparative merit of the products and services offered. Project Identification: 2021 Playground Renovation Project 1. Groveland Elementary School, 1100 North Easton Road, Doylestown, PA 18902. 2. Buckingham Elementary at 2414 Durham Road, Buckingham, PA 18912.

Bid Results

Playgrounds / Parks / Athletic Fields

$424,936.00

Public - County

Site Work

Subscribe For Documents

47 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Control, Testing and Inspecting Services, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Closeout Submittals, Warranties, Project Record Documents
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Concrete Finishing
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 09 - Finishes

Division 09 - Finishes

Wall Finishes, Stone Facing
Division 11 - Equipment

Division 11 - Equipment

Entertainment Equipment, Play Field Equipment and Structures, Playground Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Multiple Seating, Pews and Benches, Benches
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Rough Grading, Fine Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Trenching and Backfilling, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Planting, Turf and Grasses, Seeding, Sodding, Plants, Trees
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
502
Active Projects
280
Bidding Soon
4,600
All Active Projects
2,149
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 15, 2022

June 20, 2022

img_map_placeholder

Multiple Locations, Doylestown, PA


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Central Bucks School District 2022 Playground Restoration Project At Groveland Elementary School Buckingham Elementary School

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.