Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an educational facility in Los Angeles, California. Completed plans call for the renovation of a educational facility.
. The project's construction cost is estimated to be between $15M and $18M UCLA requests a written response to this Request for Qualifications (RFQ) to select an Executive Architect for the proposed Wilshire Center Seismic Improvements (Project #907031.01). Constructed in 1981, the Wilshire Center, located at 10920 Wilshire Boulevard between Wilshire Boulevard, Ashton Avenue, Westwood Boulevard, and Midvale Avenue, is a 17-story office building with 5 -levels of underground parking. The Wilshire Center houses a variety of UCLA business operations, including Campus Human Resources, Finance, ITS, Real Estate, Asset Mgmt., Government and Community Relations, and other campus departments. The retail space consists of a Wells Fargo bank branch and Trimana cafe on the ground level. The project scope will include a seismic improvement of the existing building structures. The Executive Architect will; (1) Review and revalidate a seismic evaluation report developed in October 2019 that provides recommendations for a seismic retrofit scheme to improve the building's seismic performance rating to an SPR level IV, complying with the University of California Seismic Safety Policy. (2) Provide complete architectural and engineering services required for the structural design to achieve an SPR Level IV, along with the design associated with removing and restoring all related architectural finishes and mechanical, electrical, plumbing, and infrastructure items in the area of the structural improvements. The project's construction cost is estimated to be between $15M and $18M. As applicable, and based on the specific scope of work required, the design shall comply with the University of California Policy on Sustainable Practices. The project will be required to achieve a minimum of LEEDTM Silver and shall target a LEEDTM Gold rating, with documentation prepared by the architect and submitted to the US Green Building Council. The final selection and appointment of the Executive Architect are contingent upon project approval by the University of California Board of Regents or their delegated authority. This RFQ is for full design services; however, the University reserves the right to defer negotiations for uses other than pre-design studies until the completion of the pre-design phase. very effort will be made to ensure that all persons have equal access to contracts and other business opportunities with the University within limits imposed by law or University policy. Each Candidate Firm may be required to show evidence of its equal employment opportunity policy. The project would involve the seismic strengthening of all existing columns on all 17 floors of the building, seismic strengthening of building footings, and the removal and restoration of existing sections of acoustical ceiling tile (ACT); hard lid ceilings, finishes, and any mechanical, electrical, or plumbing, infrastructure in the way of the work. Recommended seismic strengthening includes: 1. Retrofit all beam-to-column welded moment connections 2. Enhance all column splice connections for shear 3. Enhance column splice connections for flexure 4. Strengthen eight footings for flexure Implementation of seismic improvements will occur while the building remains occupied. The Executive Architect would work with Capital Programs to design and implement this project from initial study review through construction.
Post-Bid
Educational
$18,000,000.00
Public - State/Provincial
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 11, 2022
May 10, 2022
10920 Wilshire Blvd, Los Angeles, CA
Related To This Project
Los Angeles, CA
Bid Date: Apr 06 2022
Los Angeles, CA
Bid Date: Jul 10 2024
Los Angeles, CA
Bid Date: May 12 2022
Los Angeles, CA
Bid Date: May 12 2022
Los Angeles, CA
Bid Date: Mar 31 2022
Los Angeles, CA
Bid Date: May 12 2022
Los Angeles, CA
Bid Date: Apr 26 2022
Los Angeles, CA
--
As-Needed Plumbing Repair Services for Metropolitan's Eagle Mountain Pumping Plant Housing - 4694061
Los Angeles, CA
Bid Date: May 11 2022
Los Angeles, CA
Bid Date: May 11 2022
Los Angeles, CA
Bid Date: May 11 2022
Los Angeles, CA
Bid Date: May 11 2022
Los Angeles, CA
Bid Date: May 11 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.