Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in North Fork, Idaho. Working plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
Bid Cancelled The Forest is canceling this solicitation due to another GAOA project needed additional funding, use the funds from this project to award a full GAOA project. GAOA - Salmon River Road Corridor Rec. Site Maintenance (Surface Rock) 4CN The contractor shall provide all labor, materials, tools, equipment, and supervision for project GAOA - Salmon River Road Corridor Rec. Site Maintenance (Surface Rock) 4CN located in Lemhi County, Idaho. The project is to surface with commercially sourced crushed aggregate, interior driveways and parking areas at six recreation sites along the Salmon River Road west of North Fork, Idaho. If funding is available at time of award the government may exercise an option to stockpile additional aggregate at a designated location near Cove Creek Boat ramp. This location is at approximate MP 28.2 along the Salmon River Road. Aggregate is specified as commercial source and the contractor may need to perform minor surface preparation such as removal of protruding rock and roadside vegetation prior to placement. Stockpiled Aggregate, if awarded, will be placed in a neat, compact stockpile. PROJECT LOCATION This project is located along Forest Road 60030 in Lemhi County, ID between North Fork, ID and the end of the road at milepost 46. All locations are located adjacent to the Salmon River Road. The road is characterized as having flat or moderate grades and generally good alignment. The first 16.8 miles are two lane paved. The next 11 miles are a 2 lane aggregate surface with the remaining road being variable width native surface. Aggregate and native surfaces are dust abated annually. Within the individual recreation sites, contractors can expect narrow travel-ways and tight corner radiuses that could be difficult to negotiate with longer trucks. Bridges at Panther Creek, Owl Creek and Colson Creek are single lane bridges. Summer temperatures are warm in the canyon and often approach 100 degrees. Contract Time To minimize potential conflicts with recreational use and high traffic volumes, the performance period for this contract shall be April 1 to May 15 The magnitude of proposed project is between $100,000 and $250,000. Project drawings will be provided as attachments to the Request for Proposal (RFP). Dept. of Labor, Construction Wage Rate General Decision Numbers: ID20220087 01/07/2022, Highway, Bear Lake, Caribou, Clark, Fremont, Lemhi, Madison, Oneida and Teton Counties in Idaho. The complete solicitation package will be attached and made available only through SAM.gov, https://sam.gov/content/home on or within 15 days of this notice. Anyone wishing to participate in this proposed procurement must obtain their copy from SAM.gov. Copies will not be mailed from the Contracting Office. All amendments will be posted on SAM.gov. Contractors will be solely responsible for obtaining amendments from this site to update files. This requirement is being solicited as a Small Business set-aside in accordance with Federal Acquisition Regulation (FAR) 19.5, with the intent to award a Firm-Fixed Price contract. A single award will be made from the solicitation. All prospective contractors must be registered in the System for Award Management (SAM) database at http:www.sam/gov/ before award of contract; failure to register in the SAM database may cause your firm to be ineligible for the award and removed from consideration. NAICS: 237310, $39.5M *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Final Planning
Roads / Highways
$250,000.00
Public - Federal
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 30, 2022
April 1, 2022
Salmon River Rd, North Fork, ID
Related To This Project
North Fork, ID
Bid Date: May 13 2024
North Fork, ID
--
North Fork, ID
--
North Fork, ID
--
North Fork, ID
Bid Date: Jun 06 2022
Eagle, ID
Bid Date: Mar 03 2022
Moscow, ID
Bid Date: Feb 22 2022
Moscow, ID
Bid Date: Mar 08 2022
Boise, ID
Bid Date: Mar 11 2022
Nampa, ID
Bid Date: Mar 09 2022
Nampa, ID
Bid Date: Mar 09 2022
Meridian, ID
Bid Date: Mar 09 2022
Meridian, ID
--
Ahsahka, ID
Bid Date: Mar 21 2022
Moscow, ID
Bid Date: Mar 08 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.