BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a fire / police facility in Akron, Ohio. Completed plans call for the construction of a 15,064-square-foot, one-story above grade fire / police facility; and for site work for a fire / police facility.

City of Akron Local Goal: 18% EDGE/DBE/MBE/WBE/SBE/VBE (minimum 3% WBE) Engineers Estimate: $7,376,813 The Work of Project is defined by the Contract Documents and includes, but is not limited to, the following; the construction of a new one-story w/mezzanine 15,064 square foot fire station building. Site improvements include the development of approximately 4.08 acres of land. Coordinate the Work of this Contract with work performed under the Owner's separate contract: Site Package This project will have been completed as preparation for the work described in these documents. The general goal of the Site Package has been to excavate and replace existing subgrade organic soils and replace them with prepared fill. The installation of this work will facilitate traditional spread footings for the new building foundations. It is the intent of the Site Package to enable the new subsurface work to surcharge for a minimum of 60 days or as directed by the engineer to allow for settlement before the Fire Station construction begins. The displaced soils will be replaced with layers of #57 stone, the voids of which will provide the water quality and detention controls for the new Fire Station. On top of the #57 stone, #304 embankment material has been placed up to the elevation needed for the new Fire Station subbase. New roof leaders and final storm water connections from the building to the subsurface storm water controls will be completed by the building contractors. THE CITY IS ONLY ACCEPTING PROPOSALS FROM THE FOLLOWING FOUR SHORT-LISTED CMARs: The Apostolos Group dba Thomarios Construction, Kenmore Construction Co., Inc./Metis Construction Services, The Ruhlin Company, Turner Construction Company Questions Due Date: Feb 22nd 2022, 11:00 AM EST

Bid Results

Fire / Police

$9,348,802.00

Public - City

New Construction, Site Work

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
107
Active Projects
61
Bidding Soon
1,011
All Active Projects
390
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 22, 2022

May 20, 2022

img_map_placeholder

To Be Determined, Akron, OH

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.