EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 13, 2022 at 8:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Canton, Ohio. Completed plans call for site work for a water / sewer project.

Sanitary Sewer Metering Improvements: The construction required will consist of provision of all labor, equipment and materials necessary to upgrade ten (10) existing flow monitoring sites located in Canton, Jackson, Perry and Tuscarawas Townships. The upgrade for each of the ten (10) meter sites shall consist of removal of all existing equipment and installation of new control panels, electrical and control conduit and wiring, metering manhole modifications, flume replacements, meter removal and installation, all electrical de-energizing and energizing, any site relocation modifications and any ancillary work as shown on the contract documents herein. The Commissioners further declare that they will award the contract for this project to the lowest and best bid, which may not necessarily be the lowest bid. Construction work shall be subject to the prevailing wage rates established by the Ohio Department of Commerce. Each bid shall be accompanied by a bid guaranty in the form of 1) a certified check, or cashier's check, or letter of credit, equal to 10% of the bid; 2) a bid guaranty bond for the full amount of the bid; both forms of guaranty as provided in Chapter 153 of the Ohio Revised Code and in the project specifications. Each bid shall be in conformity with the Ohio Revised Code and all bids and certificates shall be upon the forms furnished with the specifications. All bid guaranties shall be conditioned that if the bid is accepted within sixty (60) days of the bid opening, a proper contract shall be executed and that upon failure or refusal to enter into said contract within ten (10) days after receipt of notification of award the bidder and surety on any bond shall be liable to the County in an amount not to exceed ten (10) percent of the bid. The Specifications contain a Bidder's Profile designed to gather certain information that may be considered in this regard. Each bidder must insure that no employees or applicants for employment are discriminated against because of race, color, religion, sex, handicap or national origin. Terms of payment shall be as provided in Chapter 153 of the Ohio Revised Code. The contractor is to initiate construction and mobilize within 30 days from the notice to proceed. The total contract duration is 180 calendar days. Failure to meet milestones will result in liquidated damages. Because SCSE is providing the ten (10) flow meters for installation, the notice to proceed will not be issued until the County has received the meters. All contractors and subcontractors involved with the project will, to the extent practicable, use Ohio and or American made products, materials, services, and labor in the implementation of their project. Additionally, contractor compliance with the equal employment opportunity requirements of the Ohio Administrative Code Chapter 123, the Governor's Executive Order 84-9 shall be required. Domestic steel use requirements as specified in sections 153.011 of the Ohio Revised Code apply to this project. Copies of section 153.011 of the Ohio Revised Code can be obtained from any of the offices of the department of administrative services. The Stark County Commissioners reserve the right to reject any or all bids, to waive any informalities or irregularities in the bids received, and to accept any bid or combination of bids that is deemed most favorable to the County at the time and under the conditions stipulated. No single factor will control the Board's decision to award, and the Board reserves the right to exercise its full discretion. Sewer District Project 612, P-612 Sanitary Sewer Metering Improvements

Award

Water / Sewer

$353,336.00

Public - County

Site Work

12

6

4

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Submittals, Bonds, Spare Parts
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 08 - Openings

Division 08 - Openings

Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating, Painting
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Electrical, Low-Voltage Electrical Distribution, Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Common Work Results for Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Earthwork Methods, Soil Stabilization, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Concrete Curbs and Gutters, Paving Specialties, Pavement Markings, Planting, Turf and Grasses, Plugging, Seeding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation, Transportation Signaling and Control Equipment, Railway Signaling and Control Equipment, Supervisory Control and Data Acquisition
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Batching Equipment, Mixers, Piece Material Handling Equipment, Cranes and Hoists
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
134
Active Projects
79
Bidding Soon
1,434
All Active Projects
559
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 17, 2022

April 18, 2022

img_map_placeholder

Multiple Locations, Canton, OH

Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

Sanitary Sewer Billing Meter Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.