BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Muskogee, Oklahoma. Working plans call for the renovation of a municipal facility.

As of 3/7/2022 project was cancelled. Estimate is $100,000 to $150,000. The City of Muskogee reserves the right to accept or reject any and/or part of all Bids, and to waive irregularities at its discretion. The City of Muskogee reserves the right to accept a Bid other than the lowest Bid, with justification, as provided by the City's Purchasing Policy. A Bidder wishing to appeal a bid award must present a written appeal to the City Manager within five (5) days of the bid opening. Each proposal must be accompanied by a Bidder's Bond or Cashier's Check upon any solvent Bank or Trust Company, payable without reserve to the City of Muskogee, Oklahoma, in an amount not less than five percent (5%) of the total amount of the bid. Bid security of the two (2) low bidders will be retained until approval of contract and execution of satisfactory bonds by the successful bidder, or until other disposition on the bids is made. Any questions regarding this bid please contact Jimmy Thomason at 218-220-0835. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Remove and dispose of 6,643 Sq. Ft. of roof down to the structural deck. Replace approximately 500 Sq. Ft. of bad decking. Provide a Sq.Ft. price for any additional. Replace approximately 140 lineal feet of wood joist. Provide a lineal Ft. price for any additional Furnish and install one(l) layer of 3.5" ISO. This layer will be mechanically fastened per manufacturer's specifications Furnish and Install 288 lineal feet of wood blocking on top of parapet walls.Furnish and install 288 lineal feet of a 5" 24ga. Metal Era( One Edge ) drip edge. Furnish and install three{3) new scuppers and 30' of downspouts. Furnish and install a 60 mil TPO single ply membrane, mechanically fastened per manufacturer's specifications. Remove existing wall flashings to a workable surface. Adhere TPO membrane to the prepared substrate. South East Metal Wall Panel 1. Furnish and Install hat channel on wall over existing metal panels. 2. Furnish and install 1,040 Sq.Ft. of R panel and trim over the existing metal wall panels. 3. Remove and dispose of all trash and debris from the site

Final Planning

Municipal

$150,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
45
Bidding Soon
739
All Active Projects
281
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 9, 2022

September 7, 2022

img_map_placeholder

301 S Cherokee St, Muskogee, OK

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.