BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 14, 2022 at 8:00 PM

Updated January 25, 2024

Site work and paving for a civil project in Greenville, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Project Category Code: Utility Street Construction and Excavation Description: Mayflower Drive Water Main Construction in the Village of Greenville, Outagamie County, WI. Additonal Description: The work, in general, will include the approximate quantities and items listed below: o 5,800 L.F. - 12-inch PVC Water Main and Appurtenances; o 250 Tons - Hot Mix Asphalt Pavement-Patch; o 150 L.F. - Jack and Bore Railroad Crossing with Steel Casing; o Erosion Control; o Traffic Control; and o Landscape Restoration.

Bid Results

Roads / Highways

$974,885.00

Public - City

Paving, Site Work

30

13

5

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
120
Active Projects
44
Bidding Soon
607
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 10, 2022

April 11, 2022

Project location map

Mayflower Drive, Greenville, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.