BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Surrey, British Columbia. Contact the soliciting agency for additional information.

The Contractor will provide the goods and services for the period commencing on May 1, 2022 and terminating on October 31, 2022. The City of Surrey (the "Owner") invites Contractors to provide a quotation on the form attached as Schedule C (the "Quotation") for the supply of the goods (if any) and services described in Schedule A (the "Work"). The description of the Work sets out the minimum requirements of the Owner. A person that submits a Quotation (the "Contractor") should prepare a Quotation that meets the minimum requirements, and may as it may choose, in addition, to also include goods, services or terms that exceed the minimum requirements. The Contractor shall furnish all necessary labour, supervision, materials, plant, equipment, layout, survey, permits, and inspections, and related services to video inspect storm sewer mains, and manholes as noted in the Contract Drawings. Furnish certificates confirming work conforms to requirements of Authorities having jurisdiction. The Work generally includes, but not limited to, zoom camera video inspection of storm mains, manhole inspections, provision for traffic control, and other related works. The Work will be undertaken at various locations throughout the City of Surrey as detailed in the attached drawings. The detailed scope of work is as described in the Supplementary Specifications -Project (Schedule B - Appendix 2) and Contract Drawings (Project) (Schedule B - Appendix 3). The lack of and/or omission of detailed specifications does not minimize the acceptable levels of service and only the best commercial practices are acceptable. Contractor to comply with all BC Plumbing Code, BC Fire Marshal, BC Workers' Compensation Board, National Building Code of Canada, BC Boiler Inspector, BC Electrical Inspector, National Fire Protection Association, and any other authorities having local jurisdiction. Failure to abide by these rules and regulations will result in being immediately escorted from the work site. SCOPE OF WORK As part of the scope of Services, the Contractor is to furnish and assume full responsibility for everything required for the orderly progress and proper execution and completion of the Services, whether temporary or permanent and whether or not incorporated into the Services including, but not limited to, materials, equipment, labour, transportation, construction equipment and machinery, tools, appliances, temporary facilities and utilities, and all other facilities and incidentals. The Services in this agreement involves: The zoom camera inspection of approximately 505,894 lineal meters of Storm Sewer Mainlines ranging from 150 to 3300 mm in diameter. The zoom camera inspection of 296 Flood Boxes on Surrey's river dykes. The video or 3D panorama inspection of approximately 7618 manholes, at various locations within the City as shown on the drawings in Appendix 3. ADDENDA All inquiries related to this RFQ should be directed in writing to the contact person named above.

Post-Bid

Water / Sewer

Public - City

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
156
Active Projects
54
Bidding Soon
2,083
All Active Projects
733
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 16, 2022

May 9, 2022

img_map_placeholder

Multiple Locations, Surrey, BC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.