BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a recreation facility in Durango, Colorado. Working plans call for the renovation of a recreation facility; and for site work for a recreation facility.

Aquatic Play Features: The Recreation Center replaced five of the initial aquatic play features in 2011 and still has some of the original features installed during construction. Many of these play features, including the main castle structure are deteriorating and have mechanical and structure issues. New structures in aquatics areas are also replaced to attract and retain clientele. Aquatics Play Structure - $226,941. Recreation Center Roof Replacement: The Recreation Center roof is the original roof and is damaged and leaks in multiple locations. The roof is currently patched on a regular basis to repair leaks. Due to more structural issues with the roof and the possibility of the implementation of the Sustainability Action Plan, which includes solar panels, it is important a portion of the roof is replaced during the installation of the solar panels. If the Sustainability Action Plan does not proceed, the roof is still in need of replacement and is over its 20-year expected lifespan. The roof replacement will be completed in phases, replacing all five sections of the rubber roof, over the next three to five years. Cost: $160,000 for the roof replacement over the leisure pool which is currently in the worst condition and is the location of the solar panels. Total project costs over 3 - 5 years is estimated at $589,000 As of February 22, 2022, this project is in the final planning phase and design is being done by owner in-house staff. It is anticipated bidding will commence in March or April 2022. A firm timeline for start of construction has not been determined. This project is in the included in the City of Durango's FY 2022-2026 CIP. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Final Planning

Amusement and Recreation

$1,195,941.00

Public - City

Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
9
Active Projects
3
Bidding Soon
64
All Active Projects
28
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2022

img_map_placeholder

2700 Main Ave, Durango, CO


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.