EN

BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 7, 2022 at 7:00 PM

Updated December 4, 2024

Site work and paving for a road / highway in Orrock Township, Minnesota. Completed plans call for site work for a road / highway; and for paving for a road / highway.

As of November 7, 2022, construction has been completed. CP 71-604-021 CSAH 4 from CSAH 5 to CSAH 15 CP 71-609-021 CSAH 9 from US Hwy 169 to CSAH 19 CP 71-613-021 CSAH 13 from CSAH 33 to E. Co. Line CP 71-661-019 CR 61 from CSAH 20 to CSAH 3 The Major Quantities of Work Are: Construct Right Turn/bypass Lanes Ea 4 Aggregate Base Class 5 Ton 585 Stabilized Full Depth Reclamation Sy 14,017 Bituminous Wearing Course Mix Ton 48,802 15" Pipe Culvert Lf 174 Seeding Ac 3 Pavement Markings Lf 150,346 All bids shall be accompanied by a bid bond for at least five percent (5%) of the amount of the bid. No bidder may withdraw their bid (which shall include the bid bond) within 15 days of the scheduled bid submittal date of Wednesday, March 9, 2022. The County Board reserves the right to reject any or all bids and to waive minor irregularities. The County Board will consider award of the contract at the March 22, 2022 County Board Meeting contingent upon County Engineer & County Attorney review. It is the County's intent to begin construction the middle part of May 2022 and completed by end of July 2022 . The County Board reserves the right to reject any or all bids & waive informalities.

Under Construction

Roads / Highways

$3,793,349.00

Public - County

Paving, Site Work

96

5

2

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 09 - Finishes

Division 09 - Finishes

Tiling
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Embankments, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Base Courses, Aggregate Base Courses, Planting, Turf and Grasses, Seeding

Find More Local Projects

Within 75 Miles of This Project
90
Active Projects
53
Bidding Soon
859
All Active Projects
335
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 9, 2022

May 16, 2022

img_map_placeholder

Multiple Locations, Orrock Township, MN

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.