BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and asbestos abatement for an educational facility in Waukegan, Illinois. Completed plans call for site work for a educational facility; and for asbestos abatement for a educational facility.

Contract A-1: Greenwood Elementary. The Contractor(s) shall be allowed (17) consecutive calendar days, commencing on or about June 1, 2022 through June 17, 2022 to complete the project, following the issuance of a notice to proceed by the Owner and the filing of the required notifications to the regulatory agencies. The Contractor shall notify the Consultant's office in writing seventy-two (72) hours prior to starting any work. The notice to proceed is expected to be issued on or about March 16, 2022. The Contractor shall be allowed a maximum of one (1) eight-hour shift per work day commencing at 7:00 AM and completed by 3:30 PM for the base bid. C. Contract A-2: Washington Elementary. The Contractor(s) shall be allowed (5) consecutive calendar days, commencing on or about March 21, 2022 through March 25, 2022 to complete Phase 1 of the project. The Contractor(s) shall be allowed (17) consecutive calendar days, commencing on or about June 1, 2022 through June 17, 2022 to complete Phase 2 of the project. Both, following the issuance of a notice to proceed by the Owner and the filing of the required notifications to the regulatory agencies. The Contractor shall notify the Consultant's office in writing seventy-two (72) hours prior to starting any work. The notice to proceed is expected to be issued on or about March 4, 2022. The Contractor shall be allowed as many shifts as required for Phase 1 and a maximum of one (1) eight-hour shift per work day commencing at 4:00 PM and completed by 12:30 AM for Phase 2. D. Contract A-3: Whittier Elementary. The Contractor(s) shall be allowed (19) consecutive calendar days, commencing on or about May 2, 2022 through May 20, 2022 to complete the project, following the issuance of a notice to proceed by the Owner and the filing of the required notifications to the regulatory agencies. The Contractor shall notify the Consultant's office in writing seventy-two (72) hours prior to starting any work. The notice to proceed is expected to be issued on or about March 16, 2022. The Contractor shall be allowed a maximum of one (1) eight-hour shift per work day commencing at 4:00 PM and completed by 12:30 AM for the base bid. Each bid shall be accompanied by either an acceptable certified or cashier's check or a bid bond, executed by the bidder and an acceptable surety company meeting all the requirements set forth in the General Conditions of the Contract for performance bond sureties, payable to the order of the Owner in an amount not less than ten percent (10%) of the total bid. Such bonds shall comply with all laws of the State of Illinois governing public contracts let by governmental units. The bidder to whom a contract is awarded shall, within ten (10) days after receiving written notice of such award, execute a contract with the School Board for the full and complete performance of all work specified and shall also furnish a Performance Bond. The Contractor shall furnish Performance Bond in an amount not less than one hundred percent (100%) of the contract price, covering the faithful performance of the contract and the payment of all obligations arising there under. Each bid shall be delivered to the attention of Mr. Kevin Krukeberg, Interim Director of Operations, Waukegan Public School District #60, 1201 North Sheridan Road, Waukegan, IL 60085. All bid documents shall be enclosed in a sealed opaque envelope, properly marked with the name and place of business, and the project for which the bid is submitted. Bids shall be delivered by the time and to the place stipulated above. It is the sole responsibility of the bidder to see that his bid is received in proper time. Any bid received after the scheduled closing time for the Contract Documents. The Owner reserves the right to reject any or all bids and to waive any formality or technicality in any bid in the interest of the Owner. No bidder may withdraw his bid for a period of thirty-days (30) after the date of Opening thereof.

Post-Bid

Educational

$282,190.00

Public - City

Asbestos Abatement, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
192
Active Projects
128
Bidding Soon
2,011
All Active Projects
859
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 16, 2022

June 1, 2022

img_map_placeholder

Multiple Locations, Waukegan, IL


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.