Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a sidewalk / parking lot in White Cloud, Michigan. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.
https://www.mrt.com/news/article/Dragon-Trail-in-Mecosta-and-Newaygo-counties-gets-17447297.php MECOSTA, NEWAYGO COUNTIES -- The Michigan Dragon Trail at Hardy Dam project received a funding boost recently when the Newaygo County Board of Commissioners appropriated over $1 million of American Rescue Plan Act funds to completion of the project, according to a news release from Newaygo County parks director Nick Smith. These newly allocated funds will pay for the completion of new (2022) construction in Newaygo County and two more phases in 2023, most notably a fully ADA-accessible mile of trail starting at Big Prairie Township's Operator Park, the news release said. "It is important that people of all abilities can experience Michigan's Dragon at Hardy Dam," Smith said in the news release. "This mile of accessible trail will allow wheelchair accessibility, and the trailhead will include handicapped parking so everyone can explore the Dragon Trail." Completion of the Dragon Trail, which will encompass part of Newaygo County and Mecosta County, will help meet the increasing demand for recreation and tourism in the region, Smith said. The 2022 construction season is adding a projected 14 miles to the previously constructed 22 miles completed since breaking ground on the project in 2019. Current construction includes an estimated 7.6 miles of trail from Newaygo State Park, continuing north and connecting to Brower Park in Mecosta County. Once the Newaygo State Park and Brower Park connection is completed, construction will move south to complete the remaining portions of the trail in Mecosta County, eventually connecting with the trailhead at Big Bend Township Park. With the recent Mecosta County board of commissioners' allocation of $225,000, the two counties have ensured that the remaining construction phases are fully funded, the news release said. Once complete, the Dragon Trail will be made up of 11 segments forming a complete 40-plus mile loop around Hardy Pond, traversing both Mecosta and Newaygo counties. Of the 22 miles already open to the public, 12 miles of trail are in Newaygo County and 8 miles of trail are in Mecosta County. Later this fall, the 7.6-mile connection between Newaygo State Park and Brower County Park will be open to the public, the news release said. The Dragon Trail already sees many visitors, including mountain bikers, hikers, trail runners and more, according to the news release. Restaurants, campgrounds and other businesses are experiencing the economic benefit of the Dragon Trail. A Michigan State University economic impact study estimated the annual economic impact to the region at over $4 million. For more information, or to follow construction updates, visit the Michigan's Dragon at Hardy Dam Facebook page or thedragon.us. _____________________________________________________________________________________________________________________________ A. Clearing vegetation, grading, and all other work associated with the construction of a cross country mountain bike trail. B. Constructing stick-built puncheons, boardwalk style bridges, and prefabricated fiberglass bridges. C. Placing rock armoring to stabilize portions of the trail tread where needed. D. Site restoration typical of projects of this type. E. Complete all work listed in detail in the attached Technical Specifications Section and other associated documents associate with this RFB. Questions regarding bid specifications shall be emailed to Dragon Trail Prime Professional, Joe Wright, at joe.wright@spicergroup.com. Our Prime Professional will make every effort to provide a clear answer to interested parties; however, makes no guarantees. This project is partially funded with a Michigan Department of Natural Resources (DNR) Trust Fund grant. All relevant State and/or Federal requirements will apply. This project does not require Davis-Bacon wage rates. A pre-bid conference will not be held for this project. The Site is identified in the Bidding Documents. All bidders are encouraged to visit and inspect the previously constructed segments of the trail prior to bidding. By definition, the Site includes rights-of-way, easements, and other lands furnished by Owner for the use of the Contractor. Any additional lands required for temporary construction facilities, construction equipment, or storage of materials and equipment, and any access needed for such additional lands, are to be obtained and paid for by Contractor. Preferred Contract Cycle 18 April 2022 - 22 November 2022
Post-Bid
Sidewalks / Parking Lot
$900,000.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 4, 2022
April 18, 2022
Michigans Dragon Trail, White Cloud, MI
Related To This Project
White Cloud, MI
Bid Date: Aug 24 2023
White Cloud, MI
Bid Date: Aug 17 2023
White Cloud, MI
Bid Date: Sep 13 2023
White Cloud, MI
Bid Date: Jan 12 2022
White Cloud, MI
Bid Date: Jan 10 2022
White Cloud, MI
Bid Date: Mar 07 2022
White Cloud, MI
Bid Date: Mar 07 2022
White Cloud, MI
Bid Date: Mar 23 2022
White Cloud, MI
Bid Date: Jun 22 2023
White Cloud, MI
Bid Date: May 30 2023
White Cloud, MI
Bid Date: May 08 2023
White Cloud, MI
Bid Date: May 08 2023
White Cloud, MI
Bid Date: May 08 2023
White Cloud, MI
--
White Cloud, MI
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.