BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Broken Arrow, Oklahoma. Completed plans call for the renovation of a water / sewer project.

As of June 15, 2023, the project has not been awarded. A timeline for award has not been confirmed. Work includes removal of an existing belt filter press and polymer mixing system, and the installation of a belt filter press, cake conveyor, polymer blending unit, and modifications to the structural and mechanical components of the existing dewatering building as described in the plans and specifications. Major equipment, including the belt filter press, cake conveyor, and polymer blending unit have been procured under a separate contract. The procurement contract for specified equipment will be assigned to the successful bidder of this contract. Contract time for the project shall be Three Hundred and Ninety-Two (392) calendar days. All qualified applicants will receive consideration for employment without regard to race, color, religion, sex, national origin, age, or handicap. Bidders on this work will be required to comply with the President's Executive Order No. 11246, as amended. The requirements for bidders and contractors under this order are explained in the specifications Sworn statement of the Bidder's assets and liabilities, technical qualifications and performance in the form of the latest annual report and financial statement are not required to be submitted with the Bidder's Proposal, but BAMA may require such statements prior to award of the construction contract. The Statement of Qualifications & Experience using the form found in Section II Proposal Documents, must be submitted with the bid and include, as a minimum, the information required herein. Failure to submit the information required in these documents may result in BAMA considering the Bid non-responsive and result in rejection of the Bid by BAMA. Bidders may be required to provide supplemental information if requested by BAMA to clarify, enhance or supplement the information provided in the Statement of Qualifications & Experience. The apparent successful Bidder shall, within two (2) days after Bid opening, submit to BAMA a list of the Subcontractors, Suppliers, individuals or entities proposed for the Work. Such list shall be accompanied by a Statement of Qualifications & Experience, using the forms found in Section II Proposal Documents, with pertinent information regarding similar projects and other evidence of qualification and experience for each such Subcontractor, Supplier, or other individual or entity. If BAMA or Engineer, after due investigation, has reasonable objection to any proposed Subcontractor, Supplier, individual, or entity, BAMA may, before the Notice of Award is given, request apparent successful Bidder to submit an acceptable substitute, within one (1) day of notification. If apparent Successful Bidder declines to make any such substitution, BAMA may award the Contract to the next lowest Bidder that proposes to use acceptable Subcontractors, Suppliers, or other individuals or entities. In such event, the next lowest Bidder shall, within two (2) days after requested by BAMA, submit to BAMA the above required list of the Subcontractors, Suppliers, and other individuals or entities. Qualified Bidders: Bidders must submit a completed Statement of Qualifications indicating sucessful completion of three similar projects each that are similar in nature and scope to this project within the past five years. In evaluating whether a Bidder is responsible, BAMA will consider the qualifications and experience of the Bidder and may consider the qualifications and experience of Subcontractors and Suppliers proposed for those portions of the Work for which the identity of Subcontractors and Suppliers must be submitted as provided above. As a Proposal Guarantee, a certified check, cashier's check, bid bond or irrevocable letter of credit issued by an insured financial institution as required by law must accompany each Proposal for an amount equal to five percent (5%) of the total Bid made payable, without reserve, to BAMA. The successful Bidder must, within ten (10) days after receiving notice of award, furnish a Performance Bond, Statutory Bond and Maintenance Bond in the forms prescribed by BAMA in the amounts equal to the Contract price.

Bid Results

Water / Sewer

$2,086,000.00

Public - City

Renovation

73

46

5

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
126
Active Projects
75
Bidding Soon
889
All Active Projects
439
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 14, 2023

April 13, 2023

May 9, 2024

img_map_placeholder

13874 S 177th E Ave, Broken Arrow, OK


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.