Site work and paving for a civil project in West Springfield, Massachusetts. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Each bidder must deposit with his bid, security in the amount of five (5%) percent of bid as a bid bond, cash, a certified check or certificate of deposit issued by a responsible bank or trust company, payable to the Town of West Springfield. A Payment and a Performance Bond, in the amount of 100% of the Contract Price will be required of the Successful Bidder. The contract will be awarded to the responsive and responsible bidder offering the lowest price. The Town of West Springfield reserves the right to reject any or all bids and to waive any informality in bidding if it be in the public interest to do so. The proposed work is required to be done in two phases. Phase 1 is water main replacement and shall be completed by Friday May 27, 2022. Phase 2 is paving improvements and shall be started after Tuesday July 5, 2022. All paving work shall be completed by Friday August 5, 2022. Install. 500 lineal feet of new six inch (6") diameter ductile iron drinking water main, two new gate valves and one fire hydrant (hydrant shall be supplied by Dpw at 135 Piper Road). The main and services will be installed at a minimum depth of five (5') feet. Work includes a connection to the existing main at a point approximately 60 feet into Chapin Street; transferring over 13 services (12 homes and one apartment building) from the existing main and the new hydrant, and a 3" depth temporary pavement patch. Paving can be completed at the end of the project in one mobilization but the contractor must adequately maintain the exposed gravel trenches for smoothness and dust. Groundwater is not expected to be an issue based on Dpw's experience. If dewatering is required it will be paid for on a time and materials basis. All Chapin Street properties have Town sanitary sewer and drinking water services. Once the temporary water main by pass system is functioning the new water main will be installed in the same location as the existing 500 feet of 4" water main, thus requiring the contractor to remove and dispose of the existing ductile iron water main. About 110 feet of water main shall be abandoned in place at the dead end of Chapin Street

Award

Roads / Highways

$245,617.00

Public - City

Paving, Site Work

3

5

4

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
369
Active Projects
217
Bidding Soon
3,281
All Active Projects
1,469
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 3, 2022

April 4, 2022

img_map_placeholder

Chapin St, West Springfield, MA

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.