Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 21, 2022 at 7:00 PM
Updated November 14, 2023
Site work and paving for a mixed-use development in Portage, Michigan. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.
03/09/2022 03:00 PM Question Acceptance Deadline The work generally consists of the preparation, cold milling, and paving of the Department of Public Works (DPW) driveways and parking lots. Such work shall be performed in accordance with the information contained in this document. All equipment and materials will be moved by DPW prior to the commencement of paving work. DPW will be adding curbing, concrete wall, storm water drainage improvements and a water line to the north lot prior to the paving operation. Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Maintenance Bond 25 % - Labor and Materials Bond 100 % - Payment Bond 100 %
Post-Bid
Sidewalks / Parking Lot
$200,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
