BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 21, 2022 at 7:00 PM

Updated November 14, 2023

Site work and paving for a mixed-use development in Portage, Michigan. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

03/09/2022 03:00 PM Question Acceptance Deadline The work generally consists of the preparation, cold milling, and paving of the Department of Public Works (DPW) driveways and parking lots. Such work shall be performed in accordance with the information contained in this document. All equipment and materials will be moved by DPW prior to the commencement of paving work. DPW will be adding curbing, concrete wall, storm water drainage improvements and a water line to the north lot prior to the paving operation. Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Maintenance Bond 25 % - Labor and Materials Bond 100 % - Payment Bond 100 %

Post-Bid

Sidewalks / Parking Lot

$200,000.00

Public - City

Paving, Site Work

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
226
Active Projects
158
Bidding Soon
1,449
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 9, 2022

April 8, 2022

Project location map

7701 S Westnedge Ave, Portage, MI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.