BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Forest Grove, Oregon. Completed plans call for site work for a water / sewer project.

All interested parties are invited to attend. Bids received after the above-stated time will not be accepted. Electronic bids will not be accepted. The work generally consists of providing all construction services, equipment, necessary tools, materials, fuel, personnel, supervision, and labor required to complete the preparation and placement as specified herein: 13th Ave Sewer Extension: o Install 350 linear feet of 8" main including 3 new manholes, 1 connection to existing main, laterals, and future tees. o Restoration of construction area o Engineers Estimate: $115,000 to $130,000 Douglas St Storm Extension: o Install 580 linear feet of 10" main including 3 new manholes and 2 catch basins. o Restoration of construction area o Engineers Estimate: $225,000 to $240,000 Bids must contain: o A residency statement as defined in ORS 279C.365. Provide a written statement on the bidder's own form (e.g. company signed letter/head). o A bid bond on the City's Bid Guaranty form, irrevocable letter of credit issued by an insured institution as defined in ORS 706.008, certified check, or cashier's check, of at least ten percent (10%) of the total bid. Bids may be rejected by the City for non-compliance with prescribed public bidding procedures and requirements, or for good cause, upon a finding that it is in the public interest to do so. Bidders are solely responsible for ensuring actual receipt of the bid by the City of Forest Grove at the place and time designated above. Bidders must use bid and bid guaranty forms (if electing to use a bid bond) furnished by the City in the bid documents. Otherwise, the bid may be rejected as non-responsive. Bidders must conform to the requirements of these bid documents and related, applicable laws. Bidders shall be solely responsible to check for and download all addenda, if any, from the City digital web site prior to bidding. Bidders must sign all Bid Forms, and in doing so, agree to comply with the statement in the Bid Proposal regarding compliance with the provisions of ORS 279C.840 or 40 U.S.C. 276a "Workers on Public Works to be Paid Not Less Than Prevailing Rate of Wage". Bidders must complete and submit, in a sealed envelope, the First-tier Subcontractors Disclosure Form provided in the bid documents, no later than two working hours after the bid are due, per ORS 00120.40(f). This form shall be submitted to the office of the City Recorder, City of Forest Grove, 1924 Council Street, Forest Grove, OR 97116 no later than 12:00 PM local time on the Day of BID CLOSING. Licensing per ORS 468A.720 (working with asbestos) is not required for this project. The City: The City reserves the right, but is not obligated, to waive any irregularities or informalities in its sole and absolute discretion. City intends to issue notice to proceed on March 25, 2022, and have the work fully completed by June 30, 2022. Form of Proposal: All vendors must accept the terms included with this Request for Proposals as part of the contract. If a proposer is exempt from a particular term due to a statutory or regulatory exception or exemption, whether the exception or exemption applies to the contract matter, the type of work, or the vendor, the vendor will be considered to have met the requirements of that term. The City reserves the right to negotiate a final contract that is in the best interest of the City. The Projects will not be awarded separately. Award of the contract will be based on total low-bid for both projects: To be considered responsive, Bidders must provide fully completed bid proposal forms. Please submit questions to the following: Derek J. Robbins, PE at djrobbins@forestgrove-or.gov Replies to these questions will be posted to the City portal. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Water / Sewer

$254,400.00

Public - City

Site Work

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
111
Active Projects
64
Bidding Soon
1,106
All Active Projects
410
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 10, 2022

March 25, 2022

img_map_placeholder

Douglas St & 13th Ave, Forest Grove, OR

Related To This Project


Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.