Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 9, 2022 at 7:00 PM
Updated November 14, 2023
Site work for a civil project in Fremont, California. Completed plans call for site work for a water / sewer project.
Project Duration: 160 Calendar Days Liquidated Damages: $1,000.00 Per Calendar Day Bid Bond Percentage: 10% The work to be done is located in the City of Fremont, California, and consists of removing existing erosion protection system; removal of existing fencing; site clearing for new soil nail wall; removal, testing, and disposal of soil in drainage ditches and from site clearing; testing and modifications to existing soil nails; installation of soil nails; installation of concrete facing over existing and new soil nails; installation of concrete stairs; and installation of bulkhead walls. Pre-Qualification for Bidders: Not Required License Type Required: Valid Class A Contractor's License by CA CSLB Engineer's Estimated Cost: $2,000,000 to $2,200,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Post-Bid
Water / Sewer
$2,200,000.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 11, 2022
May 12, 2022
To Be Determined, Fremont, CA
Related To This Project
Fremont, CA
Bid Date: Jan 19 2022
Fremont, CA
Bid Date: Feb 11 2022
Fremont, CA
--
Fremont, CA
Bid Date: Apr 04 2022
Fremont, CA
Bid Date: Apr 01 2022
Fremont, CA
Bid Date: Jun 21 2022
Fremont, CA
Bid Date: Feb 13 2019
Fremont, CA
Bid Date: Mar 14 2022
Fremont, CA
Bid Date: Feb 03 2022
Fremont, CA
Bid Date: Mar 15 2022
Fremont, CA
--
Fremont, CA
Bid Date: Feb 17 2022
Fremont, CA
Bid Date: Mar 15 2022
Fremont, CA
--
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
