BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a bridge / tunnel in Point Arena, California. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

**As of April 14, 2022, project was awarded to Viking Construction Company, awarded amount is $1,460,852.60 ** EPV: $1,400,000 - $1,700,000 Bridge Seismic Retrofit Project on Eureka Hill Road Over Garcia River - The primary purpose ofthe Project is to seismically retrofit the Eureka Hill Road Bridge over the Garcia River to meet current standards. The retrofit includes the addition ofsteel column casings to all pier pilings and adding piles and top mats of reinforcing to all pier foundations. To conduct the Project, traffic will be limited to one lane controlled during construction. The proposed Project would include installation of a 75-foot temporary river diversion; a dewatering plan that meets California Department of Fish and Wildlife requirements has been submitted. Implementing the Project will require temporary access through the old roadway alignment to the river bed in order to construct column casings and top mats to the pier foundation. Dewatering and access will allow for construction of a temporary clear water crossing (temporary work pad) beneath the bridge using culverts and cleaned river run gravel. The retrofit includes adding four 72-inch Cast-In-DrilledHole (CIDH) piles at each end ofthe bridge, excavating and constructing top mats to reinforce the pier foundations at existing piers 2, 3, and 4 using CIDH piles, installing concrete girders between the CIDH pile groups, adding bumpers to the superstructure soffit, and rehabilitating the pavement ofthe approaches The County hasincluded a Disadvantaged Business Enterprises(DBE) goal of 9% for this contract. WDID No. 1B14133WNME Completion- 85 WORKING DAYS The last day to start job site activities must be September 1, 2022

Award

Bridges / Tunnels

$1,460,853.00

Public - County

Paving, Site Work

44

15

8

5

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
22
Active Projects
11
Bidding Soon
200
All Active Projects
93
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 15, 2022

September 1, 2022

img_map_placeholder

Eureka Hill Rd, Point Arena, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.