BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a detention facility in Fayetteville, North Carolina. Completed plans call for the renovation of a detention facility.

Boiler Replacement- 1. All power wiring and associated conduit shall be provided to HVAC equipment by the Electrical Contractor. The HVAC Contractor shall furnish all motor starters, disconnect switches and combination starters for HVAC equipment and turn them over to the Electrical Contractor for installation. All final power wiring connections to HVAC equipment shall be made by the HVAC Contractor from slack wire left by the Electrical Contractor. Refer to the Contract Drawings for division responsibility regarding electrical requirements. 2. Provide all control wiring, in conduit, required to satisfactorily control all equipment included in this section. Furnish and wire all control devices such as thermostats, switches, relays and any other devices necessary to control the equipment furnished in this section. 3. HVAC Contractor shall provide power wiring and conduit to all damper and valve actuators. Duct mounted smoke detectors shall be furnished by the Electrical Contractor and installed in duct work by the HVAC Contractor. Wiring to the fire alarm system shall be provided by the Electrical Contractor. Detectors shall be installed in strict accordance with manufacturer's installation instructions and/or NFPA 72E 9-4. Location- 204 Gillespie St Fayetteville, NC 28301 The project will be completed in 2022. Bid Bond is required. Question may be submitted to the designer Glenn Bowman P.E., gbowman@thewootencompany.com at The Wooten Company up until 5:00pm on February 25, 2022. Responses will be provided via addendum on March 4, 2022 Each proposal must be accompanied with an amount equal to not less than a five percent (5%) of the proposal at the time of submission. The bidder may submit the 5% deposit by certified check or bid bond. Bid bond executed by a corporate surety licensed under the laws of North Carolina to execute such bonds. After awarding and accepting the Contract, the Contractor shall submit to the County within 10 days the Performance Bond and Payment Bond. Each bond shall be in the amount of One Hundred Percent (100%) of the contract sum and shall be in the form supplied by the County or such form approved by the County. The Work will be substantially completed within 90 days after the date when the Contract Period commences to run as provided in Clause 25 of the General Conditions and completed and ready for final payment in accordance with Clause 20 of the General Conditions within 100 days after the date when the Contract Times commence to run. The Owner reserves the right to reject any and all proposals. The County reserves the right to reject any and all proposals, to waive minor informality in proposals and to reject proposal with non-minor informalities, based on the sole discretion of the County.The State reserves the right to reject any or all bids and to waive informalities. The Work will be substantially completed within 90 days ; General Conditions within 100 days after the date when the Contract Times commence to run.

Bid Results

Jails / Prisons

$348,691.00

Public - County

Renovation

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
219
Active Projects
136
Bidding Soon
1,969
All Active Projects
829
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 11, 2022

April 11, 2022

July 20, 2022

img_map_placeholder

204 Gillespie St, Fayetteville, NC

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.