BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 16, 2025 at 8:00 PM

Updated April 17, 2025

Renovation of a mixed-use development in Toronto, Ontario. Completed plans call for the renovation of a transportation facility.

The Bloor-Yonge Capacity Improvements Project is an initiative to significantly increase the station's passenger capacity, as well as improve station systems, finishes, and back-of-house infrastructure. Work will include the construction of a second platform on Line 2 for eastbound service, an expansion of the Line 1 northbound and southbound platforms, new elevators, escalators and stairs, and the construction of a new accessible entrance and exit on the south side of Bloor Street East. Three (3) prequalified teams are as follows: (1) Bloor-Yonge Crossline Partners - Team Lead: Aecon Infrastructure Management Inc. (2) EllisDon-Barnard Joint-Venture, JV between EllisDon Civil Ltd. and Barnard Constructors of Canada LP - Team Lead: EllisDon Civil Ltd (3) Kenaidan Murphy Joint -Venture, JV between Kenaidan Infrastructure Ltd and Murphy Infrastructure Inc (KMJV) - Team Lead: Kenaidan Infrastructure Ltd. TIMELINE: As of February 24, 2025, the contract has been awarded to Kenaidan Murphy Joint Venture (KMJV). KMJV will work collaboratively with the TTC to advance the design of the BYCI project to approximately 70 per cent and develop a schedule and target pricing for implementation; this phase is expected to take approx. 2 years. Once the development phase is completed, TTC Board approval will be required to move to the implementation phase, where station design will be completed and construction will begin. *The total cost for the Bloor-Yonge Station Capacity Improvement project is currently estimated at $1.5 billion, to be funded jointly by the City of Toronto, the Government of Ontario and the Government of Canada.

Award

Transportation Terminals

$1,500,000,000.00

Public - City

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
495
Active Projects
250
Bidding Soon
4,968
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 31, 2024

April 5, 2027

Project location map

2 Bloor St E, Toronto, ON

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.