BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Tomahawk, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Est. Completion Date: Oct. 15, 2022 Pre-Bid Meeting Info: There is no prebid meeting. Landscaping (Tree and Shrub Clearing), Sewer Pump Station, Sewer Force Main, Culverts, Waterways, Stormwater Channels, Sidewalks/Curbs/Gutters, Street/Road Asphalt Resurfacing and Milling, Fittings and Valves, Street/Road Asphalt Milling, ADA Curb Ramps, Fire Hydrant, Pavement Resurface and Rehabilitation, Asphalt Pulverizing, Landscaping, Traffic Control Devices (Signals, Signing, etc.), Stormwater Improvements, Erosion Control - Temporary, Paving (Asphalt or Concrete), Roadway Pavement Markings, Street/Road Lane Construction and Repair, Street/Roadway Reconstruction , Asphalt Overlay, Street/Road Pavement Marking, Utility Street Construction and Excavation, Sewer and Water Construction, Sitework/Excavating and Grading, Curbs, Water/Wastewater Infrastructure, Paving (Highway, Road or Street) Project involves pulverizing, reshaping, and paving of approximately 8,000 SY of roadway, including 1,300 LF of 24-inch curb, approximately 2,500 LF of storm sewer pipe, and approximately 1,100 LF of water main extension along West Somo Avenue in the City of Tomahawk. Project also includes extension of approximately 600 LF of watermain and 600 LF of low pressure sanitary sewer along Mark Street in the City of Tomahawk. Additonal Description: All Work is included in a single prime contract. Construction time is of the essence. Completion delays are subject to liquidated damages. City of Tomahawk reserves the right to accept the most advantageous Bid, or to reject any and all Bids. Award of Work described herein is subject to the provisions of the Wisconsin Statutes. Bids must be accompanied by Bid security made payable to City of Tomahawk in an amount of 5% of BIDDER's maximum Bid price and in the form of a certified check, or an electronic Bid Bond issued by a surety meeting the requirements of Paragraph 6.01 of the General Conditions.

Bid Results

Roads / Highways

$1,384,628.00

Public - City

Paving, Site Work

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
16
Active Projects
7
Bidding Soon
98
All Active Projects
37
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 16, 2022

April 15, 2022

img_map_placeholder

W Somo Ave, Tomahawk, WI

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.