BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Brunswick, Georgia. Completed plans call for site work for a water / sewer project.

Award Details Contract Award Date: Jul 29, 2022 Contract Award Number: W912HN22C5005 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: JXVMX8LB9W17 Contractor Awarded Name: SOUTHERN DREDGING CO., INC. Contractor Awarded Address: Charleston, SC 29407-5969 USA Base and All Options Value (Total Contract Value): $2420985.00 Fiscal Year (FY) 22 Brunswick Inner Harbor Maintenance Dredging 1. This solicitation is set aside for competition only among small business concerns. The NAICS Code for this acquisition 237990. 2. This Acqusition w ill be procured in accordance w ith FAR 14 (Sealed Bidding). 3. The pricing information of the successful bidder shall be incorportated upon aw ard of the contract. 4. Per FAR 36.204, the Construction Magnitude of this contract is betw een $1,000,000.00 and $5,000,000.00 Contractual POC is Fabiola Ducelus at 912-652-5315, Fabiola.Ducelus@usace.army.mil The Brunswick Inner Harbor Contract provides construction services, including furnishing personnel, transportation, mobilization and demobilization, equipment and materials required in connection with maintenance dredging. This contract is traditionally performed with a hydraulic cutterhead dredge and the duration is expected to be three months from time of award. Up to 500 thousand cubic yards of maintenance material is expected to be removed from the inner harbors.The work is located in Brunswick Harbor Georgia deep draft navigation projects. Brunswick Harbor is located 70 statute miles south of the Savannah Harbor, Georgia, and 25 statute miles north of Fernandina Harbor, Florida (FL), in Glynn County, Georgia. Brunswick Harbor Inner Harbor channel is 36 ft. deep MLLW and 400 ft. wide through St. Simon Sound, Brunswick River, Turtle River, South Brunswick River, and East River.Brunswick Harbor Inner Harbor is generally dredged in late summer or fall and takes approximately two months to complete. The dredging in the Brunswick Inner Harbor primarily takes place annually in the East River which includes the East River Turning Basin and the Transition Areas (stations 0+000 to 12+000) leading up to the turning basin and immediately upriver of the basin. The South Brunswick River (stations 0+000 to 7+000) in the Brunswick Inner Harbor is the other area that may requires dredging and is primarily dredged when shoaling become problematic to navigation but is constantly monitored monthly. The Lower Turtle River (station 35+000 to 36+000) in the Brunswick Inner Harbor is another area that may requires dredging and is primarily dredged when shoaling become problematic to navigation but is constantly monitored monthly. Approximately 295,000 cubic yards of material is removed from the East River annually, approximately 20,000 cubic yards of material is removed from the South Brunswick River and approximately 300 cubic yards from Lower Turtle River when dredged. The maintenance material removed from the Brunswick Inner Harbor is placed in the Andrews Island Dredged Material Containment Area located adjacent to both the East River and the South Brunswick River. Andrews Island is the only confined upland containment area in the Brunswick Inner Harbor.Advanced maintenance depths and locations for Brunswick Inner Harbor is as follows:East River, 0+000 to 2+500 project depth is 36 with 1 of advanced maintenanceEast River, 2+500 to 4+500 project depth is 36 with 5 of advanced maintenanceEast River, 4+500 to 6+250 project depth is 36 with 1 of advanced maintenanceEast River, Turning Basin project depth is 36 with 1 of advanced maintenanceEnvironmental windows limit the timing of dredging in the Brunswick Inner Harbors. Environmental restrictions on the Brunswick Inner Harbor include a Least Tern nesting window to where dredged material must not be placed in the Andrews Island confined upland disposal area between the middle of April through the middle of August. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtmlsolNo=W912HN22B5002' to obtain more details.* *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Water / Sewer

$2,420,985.00

Public - Federal

Site Work

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
113
Active Projects
64
Bidding Soon
991
All Active Projects
437
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

July 6, 2022

September 5, 2022

December 4, 2022

img_map_placeholder

To Be Determined, Brunswick, GA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.