BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of a transportation facility in Santa Ana, California. Completed plans call for the renovation of a transportation facility.

As of April 13, 2022 this project has not yet been awarded. The project is expected to be awarded on May 23, 2022. All questions must be put in writing and must be received by the Authority no later than 5:00 p.m. on March 8, 2022. Responses from the Authority will be posted on CAMM NET no later than March 15, 2022 REMOVE AND REPLACE EXISTING FIRE ALARM SYSTEMS WITH NEW ADDRESSABLE FIRE ALARM SYSTEMS AND BACKUP POWER BATTERIES WHICH SHALL HAVE CAPACITY TO HANDLE ALL SIGNALING LINE CIRCUITS (SLC) AND NOTIFICATION APPLIANCE CIRCUITS (NAC). . 2 INSTALL NEW ADDRESSABLE FIRE ALARM CONTROL PANEL, DEVICES, AND WIRING INCLUDING DETECTORS, PULL STATIONS, AND HORN / STROBES IN EXISTING OPERATIONS BUILDING. . 3. INSTALL NEW ADDRESSABLE FIRE ALARM CONTROL PANEL, DEVICES AND WIRING INCLUDING DETECTORS. PULL STATIONS, AND HORN / STROBES IN EXISTING MAINTENANCE BUILDING WHICH HAS NEC CLASS I DIV I AND DIV II AREAS. 4. INSTALL NEW ADDRESSABLE FIRE ALARM CONTROL PANEL, DEVICES AND WIRING INCLUDING DETECTORS, PULL STATIONS, AND HORN / STROBES IN EXISTING FUEL/BRAKE/TIRE REPAIR BUILDING WHICH HAS NEC CLASS I DIV I AND DIV II AREAS. 5. INSTALL NEW ADDRESSABLE DEVICES AND WIRING INCLUDING DETECTORS, PULL STATIONS, AND HORN / STROBES IN EXISTING BUS WASH BUILDING WHICH HAS NEC CLASS I DIV I AND DIV II AREAS. 6. INSTALL NEW ADDRESSABLE DEVICES AND WIRING INCLUDING DETECTORS, PULL STATIONS, AND HORN / STROBES IN EXISTING DETAIL CLEANING BUILDING WHICH HAS NEC CLASS I DIV I AND DIV II AREAS. PROJECT LOCATION 7 INSTALL NEW ADDRESSABLE DEVICES AND WIRING IN HYDROGEN EQUIPMENT STATION (NEC CLASS I DIV I) AND COMPRESSED NATURAL GAS (CNG) EQUIPMENT STATION (NEC CLASS I DIV II). The work will include but not limited to removal of existing fire alarm systems including panels, conduits, and wiring in phases. Design and installation of new Orange County Fire Authority (OCFA), California Fire Code (CFC) and NFPA compliant fire alarm systems Bidders are advised that the Authority has revised the written questions submittal date. The written questions submittal date has been extended to now March 21, 2022. All questions must be put in writing and must be received by the Authority no later than 5:00 p.m. on March 21, 2022.

Award

Transportation Terminals

$465,095.00

Public - County

Renovation

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
235
Active Projects
112
Bidding Soon
2,419
All Active Projects
1,079
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 30, 2022

April 29, 2022

img_map_placeholder

4301 W MacArthur Blvd, Santa Ana, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.