BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a playground / park / athletic field in West Valley City, Utah. Completed plans call for site work for a playground / park / athletic field.

As of April 14, 2022 This project is already awarded to Stratten and Bratt with the awarded amount of $947,544.35. Construction will begin before mid April. Project is now under construction Rocky Ridge Park Site Improvement Project Questions regarding this RFP should be directed to Jason Erekson The work will be substantially completed in ninety (90) calendar days from the date of the Notice to Proceed. Bid Security in the amount of at least five percent (5%) of the Bid must accompany each Bid in accordance with the Instructions to Bidders. Bid Security will be returned to each unsuccessful Bidder after tabulation and award of the Construction Contract. The OWNER reserves the right to reject any or all Bids or to waive any informality or technicality in any Bid if deemed to be in the best interest of the OWNER. Contractor will be responsible for all labor, materials, equipment, coordination and incidentals necessary to complete work as described in the Contract Documents. The work to be performed generally includes, but is not limited to the following: 1. The complete construction of a new city neighborhood park Includes site clearing and grubbing, excavation and earth work, rough grading, top soil screening, irrigation system installation with controller, top soil placement, finish grading, sod/hydro-seed/drill seed turf, trees, shrubs, groundcover, concrete flatwork, concrete curbing, concrete retaining walls, pre-fabricated pavilion installation, playground installation, impact material installation, drainage system installation, lights and light piers, electrical system, electrical service, drinking fountain and park sign. Other work normally encountered during construction on improved and unimproved properties. Question Submission Close Date 3/9/2022 3:00 PM MST Construction estimate is $850,000

Under Construction

Playgrounds / Parks / Athletic Fields

$947,544.00

Public - City

Site Work

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
66
Active Projects
31
Bidding Soon
534
All Active Projects
255
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 9, 2022

April 14, 2022

img_map_placeholder

5250 Summer Ridge Dr, West Valley City, UT

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.