BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Remodeling of an educational facility in Grand Island, Nebraska. Completed plans call for the remodel of a 2,000-square-foot educational facility.

The Owner will consider the bids received for the furnishing of said labor, materials and equipment necessary for the proper construction of the aforesaid project. The General, Mechanical and Electrical, will be under one Bid. All subcontractor quotations shall be sent to the General Contractor. Bid Security is required to be submitted with bid proposal form. Make payable to Central Community College in the amount of 5% of the Lump Sum Bid Amount. Bid Security shall be of cashiers check, certified check, or Bid Bond issued by a Surety licensed to conduct business in the State of Nebraska. Form of Bid Bond is AIA Document A310. Any agent signing a bid bond on behalf of the Surety must attach a Power of Attorney effectively evidencing the agents authority to bind the Surety to the performance of the Bid Bond. Performance Bond: The Contractor shall be required to furnish acceptable bonds to complete the work and pay for all labor and materials used, said bonds to be in the amount of 100% of total amount of the Contract. See Document A701, Instructions to Bidders. Taxes: The Contractor by virtue of his contract with Central Community College, becomes a purchasing agent for the Owner on their behalf and under Statute 77-2702 does not pay sales tax. Insurance: Prior to the start of the work, completed copies of the Certificate of Insurance, AIA Document G705 shall be submitted to the Owner and Architect. A. Project Name: Central Community College - Grand Island, Board Room Remodel B. Project Address: 3134 West Highway 34, Grand Island, Nebraska 68802. C. Owner's Name: Central Community College D. Architects Name: Wilkins Architecture Design Planning, L.L.C.. E. The Contract Documents, dated February 21, 2022 prepared for the project by Wilkins Architecture Design Planning, L.L.C. F. The work consists of an approximate 2,000 sq. ft. interior remodel of the board room on the Central Community College Grand Island campus. Work includes demolition of existing interior finishes, metal stud framed walls, and associated mechanical, electrical, and audio/visual equipment. New construction includes cast in place concrete floor patching, metal stud framing, drywall, carpet tile, wall tile, ceilings, architectural casework, custom built-in board room table with integrated power and audio/visual devices, hollow metal doors and frame, wood doors and frames, interior aluminum storefront, decorative wall panels, plumbing fixtures, mechanical equipment, LED light fixtures, audio/visual equipment, and associated mechanical and electrical equipment and devices. 1.03 CONTRACT DESCRIPTION A. Contract Type: A single prime contract based on a Stipulated Price as described in Document 00 5200 - Agreement Form. B. Project will be constructed under one general construction contract. 1.04 OWNER OCCUPANCY A. Owner intends to occupy the Project upon Substantial Completion. B. Schedule the Work to accommodate Owner occupancy. 1.05 CONTRACT TIME A. The bidder, in submitting an offer, accepts the Contract Time period stated for performing the Work. The completion date in the Agreement shall be the Contract Time added to the commencement date. 2.04 PRODUCT/ASSEMBLY/SYSTEM SUBSTITUTIONS A. No technical questions will be answered by the Architect's /Engineer's office(s) during the twenty-four (24) hours immediately preceding the bid opening time and date. B. All products and manufacturers shall be as specified in the bid documents. Any requested changes in products or manufacturers shall be submitted to the Architect seven days prior to the bid date. Requested changes that have been approved will be included in an addendum. Any requested changes not included in an addendum are to be considered as not approved. The Owner reserves the right to negotiate any proposed Voluntary Alternates only with the apparent low bidder with selection based on the Base Bid and selected Alternate(s). C. The Architect does not intend to issue any addenda to the bidding documents within three (3) working days of the bid opening time and date. SITE ASSESSMENT 3.01 SITE EXAMINATION A. All Bidders are required to make a careful, close examination of the entire building areas before submitting a bid. See 01 1000 Summary for the schedule. 1.4 CONTRACTOR USE OF SITE AND PREMISES A. Arrange use of site and premises to allow: 1. Owner occupancy. 2. Use of site and premises by the public. B. Provide access to and from site as required by law and by Owner: 1. Emergency Building Exits During Construction: Keep all exits required by code open during construction period; provide temporary exit signs if exit routes are temporarily altered. 2. Do not obstruct roadways, sidewalks, or other public ways without permit. C. Utility Outages and Shutdown: 1. Limit disruption of utility services to hours the building is unoccupied. 2. Do not disrupt or shut down life safety systems, including but not limited to fire sprinklers and fire alarm system, without 7 days notice to Owner and authorities having jurisdiction. 3. Prevent accidental disruption of utility services to other facilities. OFFER ACCEPTANCE/REJECTION 4.01 DURATION OF OFFER A. Bids shall remain open to acceptance and shall be irrevocable for a period of sixty (60) days after the bid closing date. 4.02 ACCEPTANCE OF OFFER A. The Owner and Contractor shall have the right to reject any or all bids, which are in any way incomplete or irregular, and to waive any informality in any proposal. TBD, 2022: Contractors interviews in CCC Board Room. April 21, 2022: Low bid contractor recommendation presented to Board of Governors. April 25, 2022: Contract awarded: Start Digital Document Submittal Service (ORACLE, Submittal Exchange) and Administrative Requirements. (See Bid Form) TBD, 2022: Construction Starts (See Bid Form) TBD, 2022: Substantial Completion. (See Bid Form) TBD, 2022: Final Completion. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Educational

$1,119,940.00

Public - State/Provincial

Remodeling

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
16
Active Projects
12
Bidding Soon
143
All Active Projects
65
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 24, 2022

April 25, 2022

img_map_placeholder

3134 US-34, Grand Island, NE

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.