Renovation of a museum in Tulsa, Oklahoma. Completed plans call for the renovation of a museum.
Project No. 04205160 ACCOUNT NO. 170030.Buildings.4004-40043122-541104 Gilcrease Museum BP No - 4 - Structural and Miscellaneous Packages PROJECT NO. 170030 Gilcrease Museum - Phase 4 - Structural & Misc. 3A - Concrete 4A - Masonry 5A - Structural Steel 14A - Elevators 23B - Underslab Plumbing 26B - Underslab Electrical The overall aspirational Small Business Enterprise utilization for this project is ten (10) percent. Attention is called to Resolution No. 18145 of August 23, 1988, requiring bidders to commit to the goal of employing on the project at least fifty percent bona fide residents of the City of Tulsa and/or MSA in each employment classification. The City of Tulsa itself is exempt from the payment of any sales or use taxes. A Certified or Cashier's Check or Bidders Surety Bond, in the sum of 5% of the amount of the bid will be required from each bidder to be retained as liquidated damages in the event the successful bidder fails, neglects or refuses to enter into said contract for the construction of said public improvements for said project and furnish the necessary bonds within thirty days from and after the date the award is made. **Estimate Value given is the Estimate Total Project Value ***For Bidding Purposes the previous drawings and specifications from Bid Packages 01 - 03 have been added to SmartBid in the Drawings and Specifications Folders.*** This project entails the demolition of the existing three-story museum and the constructing of a new museum building in its place. The new facility will have four stories above-grade and one below-grade level built into sloping hillside. The four above-grade stories will house the lobby, atrium, galleries, administrative offices, support spaces, and other public museum spaces, while the level below grade will house collections storage. 2. The current project includes approx. 30,000 SF of interpretive galleries. The design of these exhibits within these galleries is through a separate entity under a separate contract with the City of Tulsa. The scope for this building project is to provide base building infrastructure, permanent wall, ceiling, and floor materials to a level that supports the exhibit gallery design. Exhibit gallery design, exhibit furniture, lighting, graphic, casework, and exhibit finishes are not included in the base building scope. 3. The current planning calls for phased construction that meets both existing and potential future funding. The planning also includes early design packages for foundations, structure, and the central utility plant (CUP). The phased landscape upgrades include a 'Day 1' design and an additional 'Day 2' phase contingent upon other funding availability. 4. The project also has several Alternates. See drawing schedule per package for these descriptions. 5. The new museum will sit primarily within the footprint of the demolished existing building. The new facility will have a concrete 'podium' with steel fame above. An existing tunnel connected to the adjacent HCAR (Helmerich Center for American Research) building will remain and extend to tie into the new facility's construction.
Post-Bid
Museum
$65,000,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 22, 2022
May 23, 2022
1400 N Gilcrease Museum Rd, Tulsa, OK
Related To This Project
Tulsa, OK
Bid Date: May 12 2022
Tulsa, OK
Bid Date: Apr 14 2022
Tulsa, OK
Bid Date: May 11 2022
Tulsa, OK
Bid Date: May 13 2022
Tulsa, OK
--
Tulsa, OK
--
Tulsa, OK
Bid Date: Apr 20 2022
Tulsa, OK
Bid Date: Apr 29 2022
Tulsa, OK
--
Tulsa, OK
Bid Date: May 11 2022
Tulsa, OK
Bid Date: Apr 22 2022
Tulsa, OK
--
Tulsa, OK
--
Tulsa, OK
--
Tulsa, OK
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.