Site work and paving for a road / highway in Grayslake, Illinois. Completed plans call for site work for a road / highway; and for paving for a road / highway.

It is the responsibility of the bidder to meet all requirements of the bid documents. The Village of Grayslake reserves the right to accept the bid from the lowest responsible bidder most favorable to the Village, as determined by the Village. The Village also reserves the right to reject any bid or part of a bid that does not conform to the bidding requirements or to modify or waive all formalities and technicalities in a bid, or to reject all bids. Compliance conditions are included in the bid documents. DESCRIPTION OF WORK (PCC PAVEMENT REMOVAL AND REPLACEMENT, 8") This work shall consist of the removal, disposal, and replacement of existing (PCC) ribbon in accordance with Sections 440 and 442 of the Standard Specifications and as directed by the Village Representative. The ribbon is described as 18"-24" in width and borders the intersections and crosswalks. Ribbon repairs will vary in size. Contractor shall use IDOT Class PP-1 mix for the new (PCC) ribbon. ATTACHMENT C The Contractor shall machine-saw cut a clean joint 8'' (inches) in depth at the locations marked by the Village Representative. Machine-saw cuts will not be measured for payment and shall be considered incidental to the contract. The Contractor shall carefully remove and properly dispose of the (PCC) pavement. The thickness of the new (PCC) pavement shall be 8'' (inches). If the Contractor removes or damages the existing pavement outside the limits designated by the Village Representative for removal and replacement, the Contractor will be required to remove and replace that portion at his own expense to the satisfaction of the Village Representative. This work shall be paid for at the contract unit price per square foot for PCC PAVEMENT REMOVAL AND REPLACEMENT 8''. VI. DESCRIPTION OF WORK (PCC DECORATIVE STAMPED SIDEWALK REMOVAL AND REPLACEMENT 5") This work shall consist of the removal, disposal, and replacement of existing (PCC, DECORATIVE) stamped sidewalk in accordance with Sections 440 and 442 of the Standard Specifications and as directed by the Village Representative. Sidewalk repairs will vary in size. The Contractor shall machine-saw cut a clean joint 5'' (inches) in depth at the locations marked by the Village Representative. Machine-saw cuts will not be measured for payment and shall be considered incidental to the contract. The Contractor shall carefully remove and properly dispose of the (PCC, DECORATIVE) stamped sidewalk. The thickness of the new (PCC, DECORATIVE) stamped sidewalk shall be 5'' (inches). If the Contractor removes or damages the existing sidewalk outside the limits designated by the Village Representative for removal and replacement, the Contractor will be required to remove and replace that portion at his own expense to the satisfaction of the Village Representative. This work shall be paid for at the contract unit price per square foot for PCC DECORATIVE STAMPED SIDEWALK REMOVAL AND REPLACEMENT 5''. VII. DESCRIPTION OF WORK (PCC, DECORATIVE, RED DYE PAVEMENT REMOVAL AND REPLACEMENT, 8") This work shall consist of the removal, disposal, and replacement of existing (PCC, DECORATIVE, RED DYE) pavement in accordance with Sections 440 and 442 of the Standard Specifications and as directed by the Village Representative. The repairs will vary in size at each location. Contractor shall use IDOT Class PP-1 mix for the new (PCC, DECORATIVE, RED DYE) pavement. The Contractor shall machine-saw cut a clean joint 8'' (inches) in depth at the locations marked by the Village Representative. Machine-saw cuts will not be measured for payment and shall be considered incidental to the contract. The Contractor shall carefully remove and properly dispose of the (PCC, DECORATIVE, RED DYE) pavement. The thickness of the new (PCC, DECORATIVE, RED DYE) pavement shall be 8'' (inches). ATTACHMENT C The following application rate shall be used for the Color Release Agent: A. Color Release Agent- Approximately 3 lb. /100 sq. ft. Apply color release sparingly to colored surface by broadcast method, approximately 2 to 3 rows ahead of the planned stamping tool placement. Stamping method shall be done to match the existing pattern. Tooling shall be done when stamping tools are removed after imprinting. Eliminate all squeeze joints between stamping tools, if any, with hand tools prior to concrete setting. Allow 24 hours before removing excess release from the slab with garden hose. If the Contractor removes or damages the existing pavement outside the limits designated by the Village Representative for removal and replacement, the Contractor will be required to remove and replace that portion at his own expense to the satisfaction of the Village Representative. This work shall be paid for at the contract unit price per square foot for PCC, DECORATIVE, RED DYE PAVEMENT REMOVAL AND REPLACEMENT, 8". VIII. DESCRIPTION OF WORK (PCC, DECORATIVE, RED DYE SIDEWALK REMOVAL AND REPLACEMENT, 5") This work shall consist of the removal, disposal, and replacement of existing (PCC, DECORATIVE, RED DYE) sidewalk in accordance with Sections 440 and 442 of the Standard Specifications and as directed by the Village Representative. The repairs will vary in size at each location. The Contractor shall machine-saw cut a clean joint 5'' (inches) in depth at the locations marked by the Village Representative. Machine-saw cuts will not be measured for payment and shall be considered incidental to the contract. The Contractor shall carefully remove and properly dispose of the (PCC, DECORATIVE, RED DYE) sidewalk. The thickness of the new (PCC, DECORATIVE, RED DYE) sidewalk shall be 5'' (inches). The following application rate shall be used for the Color Release Agent: A. Color Release Agent- Approximately 3 lb. /100 sq. ft. Apply color release sparingly to colored surface by broadcast method, approximately 2 to 3 rows ahead of the planned stamping tool placement. Stamping method shall be done to match the existing pattern. Tooling shall be done when stamping tools are removed after imprinting. Eliminate all squeeze joints between stamping tools, if any, with hand tools prior to concrete setting. Allow 24 hours before removing excess release from the slab with garden hose. ATTACHMENT C If the Contractor removes or damages the existing pavement outside the limits designated by the Village Representative for removal and replacement, the Contractor will be required to remove and replace that portion at his own expense to the satisfaction of the Village Representative. This work shall be paid for at the contract unit price per square foot for PCC, DECORATIVE, RED DYE SIDEWALK REMOVAL AND REPLACEMENT, 5".

Bid Results

Roads / Highways

$41,469.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
188
Active Projects
101
Bidding Soon
2,108
All Active Projects
910
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2022

March 31, 2022

img_map_placeholder

Multiple Locations, Grayslake, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.